Present: Alexandre Lasheen, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Michael Schenk, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Zisou Charilaos
Matters arising
- ACTION - A. Butterworth: provide update on interlock interfaces along with available diagnostics (interlock tree - what triggered the dump?) ;
- ACTION - P. Baudrenghien: update simulation results with input parameters from operational scenarios, i.e., injected beam will be 2.6e11, 2.4e11 towards end of ramp; calculation for power with 10 kW outside beam segments; new algorithms for power optimization;
- ACTION - Kevin, Reyes, Giulia and Theo: look at parameter model of slip stacking to be implemented in LSA (e.g. duplicate RF voltage parameter);
- ACTION - Mike: keep following up on MKP potential vacuum issue with serigraphy upgrade;
- ACTION - Verena, Johan, Kevin: logging for TT10 power converters;
- ACTION - Ivan, Danilo, Giulia: get back to OP as soon as they can provide input in updating the LSA parameter model for longitudinal blow-up
- ACTION - Kevin: reach out to WS team for input on beam commissioning planning
- ACTION - SPS coordination: update AWAKE and HiRadMat pre-testing with latest RF schedule asap
First day of beam commissioning (K. Li)
- First day with threading beam went very well, ALPS performed very well; meanwhile LHCPILOT captured with all 6 cavities pulsing; cavities pulsing now on all cycles; SFTPRO not yet captured, energy matching still needs to be done --> important milestone so that aperture measurement can be correctly set up
- First aperture measurements done in H and V at QD locations; new running sums cut off beam very often; many dumps
- A few features visible in in first aperture scan even when removing BLM clipped locations; using real current for bumps; no danger of BPM calibration issues; bumps look correct; Brennan: could BA2 be some artifact from beta beating? Would be interesting to see what beat-beating would do? The losses shown are always on both sides.
- First kick response measurements show a few polarity inversions and fluctuating gains for ALPS; all gains still need to be updated now
Bunch-by-bunch tune shifts - latest updates (C. Zannini)
- Bunch-by-bunch detuning due to multi-bunch-mutli-turn wakes;
- Good correspondence between simulations and measurement in the vertical plane; peculiar observations were made in the horizontal effect; signature showed threshold effect which gave the suspicion of electron cloud;
- Simulations in the horizontal plane usually show a good correspondence with measurements and thus give some confidence in the understanding of the machine impedance effects; important effects are also visible in the vertical plane;
- Obtained results are very sensitive to analysis methods, i.e., number of turns used for FFT
- Seems to be a combination of decoherence and a resulting gradual suppression of the dipolar tune shift; after several turns, only the quadrupolar tune shift remains; moreover there is a considerable tune shift that need to be taken into account;
- Nonlinear behavior observed in measurements in the horizontal plane are not easily explained by e-cloud effects; on the other hand, this on-linear behavior can be reproduced with simulations using only impedance and no e-cloud; this effect was analyzed in more details; a link to the presentation can be found on the slides;
- Goals for 2021:
- Measure tune shifts in vertical plane; disentangle coherent and incoherent tune shift
- Verification of vertical instability
- Check non-linear intensity effect in the horizontal plane (did it change, e-cloud?)
- Establish procedure for multi-bunch operation
- Measurement from LHCBPMs? Damper uses much less turns for tune computation...
- Wolfgang: one needs to remember that the damper tune needs to match the machine tune to
- Brennan: what did you need to add in the simulations to get the non-linear effects observed in the horizontal plane? We needed to add nonlinearities in synchrotron motion and chromaticity;
- Carlo: add links to meeting you quoted sides on Indico
Status of the SPS TFB integration (M. Schenk)
- High level parameter model for generation and operation;
- Large hierarchies with 1000s of relations had to be added in LSA; this should be clearly done at the FESA level;
AOB and Round Table