Present: Alexandre Lasheen, Andrea Boccardi, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Michael Schenk, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Zisou Charilaos

Matters arising and open actions 

- ACTION - A. Butterworth: provide update on interlock interfaces along with available diagnostics (interlock tree - what triggered the dump?) ;

- ACTION - P. Baudrenghien: update simulation results with input parameters from operational scenarios, i.e., injected beam will be 2.6e11, 2.4e11 towards end of ramp; calculation for power with 10 kW outside beam segments; new algorithms for power optimization;

- ACTION - Kevin, Reyes, Giulia and Theo: look at parameter model of slip stacking to be implemented in LSA (e.g. duplicate RF voltage parameter);

- ACTION - Mike: keep following up on MKP potential vacuum issue with serigraphy upgrade;

- ACTION - Ivan, Danilo, Giulia: get back to OP as soon as they can provide input in updating the LSA parameter model for longitudinal blow-up
 

Beam commissioning updates (Kevin) 

  • Should try to avoid to fall with the BBA into next week's prolonged weekend; this would essentially lead to a loss of 4 days; this seems to be hard to achieve though; will need to tentatively shift the schedule accordingly;
  • Next decision point is 17th May to check for potential delay to be announced;
  • ACTION: present update at the IEFC;

RF commissioning status and plans (Philippe)

  • HW side reproducibility of clicks still an issues; specially found after reboot;
  • Sampler has a problem - so resampling at fixed clock is not working for the moment; signal for phase loop and radial loop need this signal keeping phase loop open after ramp, the beam went through the ramp successfully;
  • SFTPRO acceleration needs the radial loop, this will need the re-sampler to work;
  • Hannes: If the re-sampler is fixed, what will still be missing? Philippe: It will be mainly the setting up of the transition crossing which can be tricky;

Losses and findings on FT cycle (Verena)

  • Aperture scans using local bump scans and BCT signals; first scans fooled by too tight BLM thresholds;
  • Aperture restriction in 217 - access was done last night, no obvious aperture restriction, will need to open the tank; another on-conformity was seen further downstream but does not seem to be the main issue for the observed aperture bottleneck;
  • Horizontal aperture scan at the QD locations show some improvement of the fixed locations; however, not all locations exhibit the expected improvements; only about 50% of the repairs were successful - even lost a little on the outside; perhaps would be good to check why the repairs did not work for all QDs;
  • VSC will investigate what could be the reason, why the repairs have not worked for some of the locations; - ACTION: follow up
  • QF aperture scan showed no significant unexpected restrictions;
  • Aperture scan was done in LSS1 at the MSI and showed and aperture of 26 mm instead of > 45 mm and it seems that the losses are occurring at the MSI1; Chiara would like to check in the tunnel with a radiation measurement; ACTION: access needed with RP, could be done in parallel with ZS access; it is to be noted, that this measurement has never been done yet in the past, so there is nothing really to compare with;

Studies on eddy currents (Hannes)

  • Investigations on aperture scan cycle showed strong drift of mean orbit right after injection;
  • Dedicated experiment using two aperture cycles with different cycles played right before (normal SFTPRO cycle and a 'flat' cycle with non-ramping magnets); orbit became flat for cycle without ramping magnets in front of it; the same was observed for the tune in combination with the quadrupole magnets;
  • Test on momentum trim was done to check whether this effect can be compensated for orbit and tunes; first tests look promising and the techniques could be used in the future together with optimizers to get a correction for any supercycle composition;

Injection studies, beam dump studies (Francesco)

  • Injection studies done on MD4 investigating injection losses; Fransceso compared the different transfer line and ring BCTs to compute and compare transmissions;
  • TT10 kick response measurements (done for the first time in 10 years); trick done in YASP lead to an initial misinterpretation of the data, this was later understood; actual problem was found nevertheless for MAL.1001 and MBIV in taking into account the sign inversion at the second dipoles; disabling the corrector gave good prediction but the MAL.1001 seems to give a factor of
  • Hannes: these inconsistencies are due to the new model of TT10 or this has always been there? Francesco: This has always been there already;
  • SBDS: first dumps on the dump BTV screen; already with first dumped beam one could verify the polarity of the MKDH; first bucket scan was also done to inspect bunch moving on waveform of MKDV;

ALPS: latest results, behaviour with intensity, gains with FT beam, next steps before beam based alignment (Andrea) 

  • System essentially operational and has been working from the start; a few issues were found and identified and are now under further investigation;
  • Calibration for high intensity bunches is currently bad; this appears for intensities around 1e11 ppb which is exactly the intensity of an LHCINDIV bunch; currently, attenuators were added to fix this, but this will not work for bunch intensities beyond 2e11; more data is needed to exactly understand the sources for the discrepancy; intensity scans would be useful to help debugging;
  • Possible mitigations:
    • Add external attenuators;
    • Calibration with beam... requires new FPGA code and SW - would need COAST and scraping of very high single bunch intensity;
  • Test that would help?
    • Beam scraping --> intensity scan
  • Kick response measurements showed systematic error; could be fixed by gain corrections;
    • Double optics suing same beam could be helpful to extend data;
    • Hannes: would also need to check whether this is not just beta-beating; this could be checked using turn-by-turn measurements and looking at phase beating;
    • Verena: a few percent error is already very good and much better than what we have had in the past
    • Andrea: we still would need to investigate the high intensity beam with scraping - ACTION: follow-up!
    • Hannes: the turn-by-turn capability is available and synchronized to the current injection; synchronization in the turn should need to be done;
There are minutes attached to this event. Show them.
    • 09:00 → 09:15
      Beam commissioning updates 15m
      Speaker: Kevin Shing Bruce Li (CERN)
    • 09:15 → 09:30
      RF commissioning status and plans 15m
      Speaker: Philippe Baudrenghien (CERN)
    • 09:30 → 09:45
      Losses and findings on FT cycle 15m
      Speaker: Verena Kain (CERN)
    • 09:45 → 10:00
      Injection studies, beam dump studies, studies on eddy currents 15m
      Speakers: Francesco Maria Velotti (CERN), Hannes Bartosik (CERN)
    • 10:00 → 10:15
      ALPS: latest results, behaviour with intensity, gains with FT beam, next steps before beam based alignment 15m
      Speaker: Andrea Boccardi (CERN)