Present: Alexandre Lasheen, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Jonathan Emery, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Michael Schenk, Nico Madysa, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Zisou Charilaos

 

Aperture bottlenecks LSS2, LSS1 - findings and proposals (Chiara)

  • Status update of VSC activities:
  • LSS1 118 - already gave issues with vertical alignment; was resolved during LS2, now also horizontally probably not in correct nominal position; support modifications done to guide rectangular Y chamber toward TT10 line; if this doesn't work, increase aperture with larger bellows; aperture enlargement further upstream also possible --> what about impedance? ACTION: Stay in close touch with impedance for any potential solution;
  • CV: what is the length of the pip you want to insert? Rectangular chamber was aligned better? Yes, this is the case by modifying the support laterally; if you want to enlarge aperture, does this mean --> make sure impedance team is in the loop; FV: we should measure the gain first that we could even get with any potential aperture changes; this should not be the baseline now as we should have already gained lots of aperture; we can take a decision after the measurements have been done;
  • Do we know why this is so bad now? it was probably always hidden but it might have been hidden by other items; the reason why this did not appear in the aperture calculations is because this manifests really as an offset; why the offset was not in the database is not clear; FV assumes this was not actually aligned;
  • CV: clamping the bellow is not an option; HB: we had the larger chamber before, moving back would we not just restore the old situation? We could move from 159 to 219, one would need to see if this was tapered or if it was a stop; aperture could be measured over the long weekend;
  • Production of job for new bellow launched; should be ready by end of next week so that ZS and this
  • LSS2 - seemed like 2 issues at first; earliest intervention 19 May to replace chamber; CV: what was the problem here? The vertical aperture was simply by a wrong design smaller, but taper is kept;
  • LSS1: issues of RGA connected to e-cloud monitors; would need to be replace if issue can not be solved; could be in the shadow of 118 intervention; how far is this from the MKP, is a lot farther; risk? Investigate this ACTION: OP to decide;
  • VK: we have the 117 as one of the smallest apertures; we used to have the same installation in 5 and we are wondering of this is not creating a slight aperture bottleneck; ACTION: Chiara to investigate;
  • BG: The BLM signal cable problem, why was this not seen during HWC; we cannot see this easily during HWC, normally they g around with batteries to check except a few places, where there is more radiation; BG: this may not be the best strategy, as we then risk to have to go into a potentially hot machine to do a fix when we could have gone in after a 2 years cool-down (ACTION: discuss this with Christos & CO);
  • VK: the QD-MBB situation, when could we invetsigate this? Could this happen in parallel with some of the upcoming interventions? Chiara: we would need to check a little the priorities together; perhaps one could already see something from the outside; ACTION: Chiara still looking around

MTE mismatch & beam dump checks and latest news on vacuum (Francesco)

  • Large mismatch observed when injecting the MTE core from the PS; this is usually always the case but not that obvious when injecting the islands which are better matched;
  • Review of studies done previously by E. Benedetto; already then showed strong mismatch of core;
  • Studies with measurements were done to investigate the core better; the stitched model from PS to SPS agrees remarkable]y well; should now also be checked with islands; and finally, a similar check should also be done for the LHC beams as there also seems to be a slight mismatch; now we have a pretty good understanding of how to model this mismatch;
  • We could think about how to weight the islands and the core to give an improvement;
  • VK: nevertheless the initial conditions we have right now are not the ones you would propose for the rest of the year; in any case we would have to change these, right? Yes indeed, we should update the settings and review the process, but we would need input from the PS to see what we had at extraction in order to rematch the line;
  • HB: what was the blow-up excepted? For 1e-4 we expect 0.1 um in blow-up; but this goes squared with dp over p; did you also estimate from the betatron mismatch? This would be roughly between 10 and 20%;
  • Beam dump checks are ongoing; we have seen with high intensity LHCINDIV vacuum activity in the MKDV1 which was correlated with intensity; it was however also correlated with having on or not the BGI magnets which are right next to this kicker; suggestion would be to make more systematic measurements; this should be done systematically once we have more stable beams ACTION: follow-up on this and carry out systematic studies;

ALPS update (Andrea)

  • Problems in the past could be traced back to an issue with the selection mask; this was pretty easy to fix;
  • Even after these fixes there have been smaller effect or spikes on certain BPMs; this is still under investigation; most of these BPMs are BPCEs, others are also BPHs, so for BBA Andrea would advise to use beam intensities below 1e11;
  • Kick response gave strong mismatch of gains for certain BPMs; it turned out that this is optics dependent; still certain BPMs have need identified that need further follow-up
  • Slot 1 is not fixed for now, we need to decide on a solution for this - ACTION: follow up and discuss the best solution for the first turn and synchronization with pre-pulses for all beams (Verena, Giulia, Tom, Andrea, Hannes, Heiko, Andy, Greg);
  • HB: what do we need to prepare if we create another single bunch cycle? ACTION: Andrea to check with Hannes to force the single bunch mode; apart from that, a copy from another single bunch cycle should work fine;

Wire scanners update (Jonathan)

  • First measurements done on an SFTPRO1; results look promising,though the measurement procedure was still a little `unstable`
  • Issues with bunches jittering potentially found in the firmware;
  • Long term studies ongoing: PMT assembly, bandwidth limitations, low motion speed stability;
  • Ongoing features to satisfy functional specs; multiple speeds and wire protection under development, requires extensive tests;
  • For next 1.5 weeks 4 scanners will be usable for OP, FW/SW is frozen; what is the expectation of readiness for the scrubbing run which should take place in 2 weeks?
  • HB: we will do some measurements with different HV settings so that you have data to analyze; feature of having multiple scans along the cycle is not super high priority; what is much more important for us at the moment is to get a single working measurement with fixed bunch selection etc.; this alignment is really important to have reliable bunch-by-bunch scans;
  • VK: in principle in 2 weeks,we may start 25ns beams; this is when we would rally need to have the issue with the alignment should be solved; J: this issues with the jittering might be solved by the firmware update; a SW update should not be required for this; Ana: right now the jitter does not seem to be a SW issues, the ball is at the FW side;
  • HB: will be be able to choose the wire speed ourselves as well in the future? This will be the idea to give a selection of speeds with protection;

Radial position drift from eddy current- feed forward correction (Verena)

  • Idea to implement feed-forward to compensate for eddy current effects on main magnets;
  • Build a feed-forward loop measuring radial position with de-noising and acting on momentum trims;

Updates on RF beam commissioning (Philippe) 

  • Status and timeline of achievements so far;
  • VK: what is the status of the cavity conditioning? Philippe, we keep pulsing; if we want to push the cavities we should get in touch with Eric; ACTION: see if we can spend some time on CC conditioning;
  • FG: the piquet is operating during the weekend; to improve voltage holding of cavities they also will need the beam; ACTION: get in touch with Eric;
  • Reyes: the FW upgrade for transition crossing, will the ions also profit from this? Philippe: this is valid for all beams, also the ions will also profit from this;
  • Reyes: the switching from synchro to radial for protons, can we assume this will also work for ions? Philippe: this should not be an issue; Giulia: we now have a unique system for all beam types which will simplify setting up;