Present: Alexandre Lasheen, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Michael Schenk, Nico Madysa, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Zisou Charilaos
Actions
Notes:
- MKDV should be okay at flat bottom
- Philippe: ions - HWC was agreed with Reyes, but must be reviewed RF internally; can be attacked once intensity ramp up of protons is fixed;
Hannes:
- BBA done to avoid using too many correctors at flat top - this to reduce failure modes and as they are not very efficient at flat top
- Python script prepared that reads ALPS data and computes combined optics response matrix for quadrupole shifts using cpymad; YASP method did not work as expected, so Python script became vital;
- Very good results obtained after alignment, very consistent with predictions from Python script; vertical bare orbit is good enough such that no correctors are needed on entire cycle of LHCPILOT beam;
- Changes in orbit when e-cloud or BGI magnets are on;
- Single iteration found to be sufficient this time!
- Could we turn the script into a tool? To be discussed --> ACTION: Nico, Michael, Hannes to make a tool of it;
- Reyes: would you consider to study using orbit correctors in the future in order to avoid having the access; it is still good and you clean up the entire machine and increase the dynamic range, simplifying the setting up;
- George: slide 4, horizontal alignment counter-acted previous shift, how about the vetrical plane? HB: machine was totally realigned, machine is ; GT: BGI magnets were off during studies;
- FV: did you check the effect of
Verena:
- Method of aperture scans using local bumps and scraping the beam;
- In 118 aperture of 26 mm where it should be > 45 mm; Chiara and VSC investigated this and found a misalignment of vacuum chambers; this was corrected, now we are at 43 mm; this is still not the full aperture, question is whether this is enough; Francesco had a look at the separatrix and at this location the envelopes very much overlap between injected and slow extracted beam, so the aperture should be enough; proper solution will be implemented during YETS;
- FV: one needs to pay attention how to compare the numbers from the aperture measurement and the exact location for which Francesco did the evaluation
- Next step will be to check the aperture in 217
Francesco:
- Ongoing work, just giving a snapshot
- Few scans of kicker wave forms done for MKDH and MKDV; scans done changing the injection bucket number; all automatized via script;
- Tracking with energy looks good;
- MKDV deflection looks good; MKDH deflection looks too low, this is being investigated;
- HB: would the eddy currents also apply for the MKDV? FV: normally this should rather be a problem for the MKDH, not so much for the MKDV;
Philippe:
- LHC and SFTPRO beams ready RF-wise;
- Minor issues with actions presented; ongoing in parallel;
- Giulia and Philippe to get in touch for putting together the diagnostics;
- Hannes: when crossing transition there were transients; we also had missing voltage, we see this also for other beams; would be important to know where we stand with the real voltage, in case we clamp; Greg - we have internal acquisition in firmware - we need to voltage; ACTION: Kevin to get in touch with Greg to send wiki page
- Hannes: if you have all phase and voltages, can we not compute voltages and phases in FESA? ACTION: Andy to look into this...;
Tom:
- Lots of usage of WS since last meeting; measurement efficiency not very high yet, though;
- Uncertainty from bunch-to-bunch jitter has been traced back to FW; fix is being deployed;
- HB: scrubbing will start in 10 days; one of the main goals is to use the wirescanners to take emittance measurements;
- HB: is the modulation of light intensity understood; this is under investigation but it should not affect the beam size measurement;
- VK: how are you doing the protection in the end? Nothing changes to run 2;
Athanasios:
- ALPS interlocking tested; extraction setting up was tested and interlocks are working;
- Buckets alignment was done; first turn is actually same turn as in FIFO; this needs to be followed up with Friday's update;
- Fixed ongoing now during access;
- ACTION: send Verena a list of BPMs that were inverted so that OP can check;
- Extraction interlock; ideal would be to reduce tolerances to 0.5 mm; from what was seen, this would not work with 0.5 mm, maybe this will get better with multi-bunches; ACTION: include this into tomorrows test
RT:
- LSS1 aperture limitations: at this very location that was analyzed by Francesco we have a current aperture of 37 mm --> we should definitively do something about this in the YETS;
- Power limitations and cavity conditioning update;
Actions
Update on dispersion mismatch (Francesco)
- Dispersion mismatch is not yet understood; dispersion measurements from SFTPRO core (this show a mismatch according to the model) have been made as well as for Q20 and Q26 LHC-type beams; Q20 shows mismatches, Q26 looks matched; 3 sets of measurements are being analyzed; main problem remains with LHC Q20 model, still being investigated;
- LSS2 aperture:
- 118 aperture improved with corrector bump at QF but aperture to be measured at transition location --> aperture hot spot location is QF 37 mm only --> still missing about 10 mm from stay-clear region; should be investigated at the latest at the YETS, so far no losses seen with low intensity slow extractions;
- Francesco: chambers should be realigned; Chiara, the bigger aperture for transition is already produced, but Chiara is also concerned with the positioning of the rectangular chamber; it is strange that this appears only now as this part has never been touched; Verena thinks this was just hidden by the larger aperture; Francesco remarked that even a larger chamber will not hide the offset; ACTION: keep 188 on the list and revisit;
Vertical aperture in LSS2 (Verena Kain)
- Vertical aperture after BBA reveals no deterioration after LS2; 217 much improved; it does not yet seem at the 2018 level but should not be a problem;
- 5+/6- looks improved; perhaps this is linked to poor orbit in 5/6 before BBA;
- Chiara: will discuss 117 tomorrow morning; Chiara has a suspicion of where it could come from; ACTION: to be checked with Verena tomorrow
Status of fast extractions - what is still missing (Verena Kain)
- All BTV images after extractions;
- Extraction setting up must be finished this or early next week before COLDEX will come in; AWAKE rephasing needs to be sorted out before --> ACTION: finish commissioning of AWAKE rephasing
- Closure of bump in LSS4 was improved using an improved knob;
- HiRadMat aperture scan will be done next week; TPSG alignment is not necessarily done; Verena: should we do a shadowing test to make sure the beam comes as expected? ACTION: include this in foreseen tests
Slow extraction status, ZS alignment, losses in 2021 versus 2018, losses in LSS1(Francesco)
- Setting up procedure presented;
- Timings still difficult to manipulate; ACTION: Kevin to follow up with Fabio + BC timing?
- ZS alignment done in 20 steps; losses clearly reduced after alignment; time? How does this compare to hand-alignment?
- Full alignment done yesterday evening; sharing between ZS and TCDE comes out very well after automatic alignment;
- Radial jitter traced back to slow loop toggling; after settings revision this is fixed;
- Kevin: how does the auto-alignment compare to alignment by hand? It is much faster and should get to same results in terms of loss improvements, although there are additional tricks cab be played by hand; Francesco: we should collect items that can be improved, i.e., motor movements, to help the automatic alignment, and should be communicated; ACTION:
- Wolfgang: is the transverse damper on during SX? At this point we have not jumped to the unstable phase yet; but this can be done in the future to enhance the debunching, but this has not been set up yet; it needs to be discussed with Gerd when the damper needs to be switched off
RF status and plans - preparations for 25 ns (Philippe)
- Fine adjustment with cavity rephasing on LHCPILOT;
- SFTPRO and AWAKE two issues found;
- 800 MHz 200 MHz clock setting up ongoing;
- BC going into pause happened twice; this is a reliability issues that still needs to be investigated;
- Cogging of AWAKE being investigated;
- RF gymnastics on SFTPRO? ACTION: still need to come as a test; Francesco: can we already do this now or should we have the 4 islands? ACTION: for next week;
- On 28th June we need to hand over the beam to the NA for th NA beam lines setting up; for that moment on, the SPS needs to be stable, even though experimental data taking will only take place after;
- Philippe: cogging can be solved, what about the RF gymnastics, is this planned? This might be an issue if we need to set up AM modulation; what is left in the commissioning of the AWAKE beam? Verena: it is not entirely clear that we will need to do the RF gymnastics at this stage; idea would be to start without and we refine once we are in the first run; ACTION: OP to clarify with AWAKE; Elena: rotation is not needed necessarily after the last simulations, but we need maximum voltage; question is on the voltage program for AWAKE --> ACTION: by end of week clarify voltage program needs!
- Reyes: ion BC planning; needs follow-up; at the moment the ions are likely to be before the LHC setting update least in the beginning (1 week before and next weeks after); ACTION: discuss together the impact of calendars send out invitation;
- Verena: conditioning needs to take place
WS status and latest updates (James)
- Latest upgrades done yesterday evening;
- Bunch jitters looks more stable after last update; PM selection still seems to need more tuning (still more tests required);
- JIRA issues created;
- H/V all working same now? Take measurements this week with multiple bunches; fit algorithms in application?
- Federico:
- Bunch jitter stability was tested thoroughly and was stable - so hopefully this is fixed;
- PM selection still is not working perfectly and needs further tuning;
- Fit in application would need to be revived and implemented;
Round table / AOB