LIU-SPS Coordination Meeting

→ Europe/Zurich
Zoom

Zoom

Zoom Meeting ID
97904172722
Host
Kevin Shing Bruce Li
Useful links
Join via phone
Zoom URL

Present: Alexandre Lasheen, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Michael Schenk, Nico Madysa, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Zisou Charilaos, Lotta Mether

Actions

Dispersion mismatch studies (Francesco Maria Velotti)

  • Francesco - update on dispersion:
    • Dispersion measured in TT10 and first run; SFTPRO core mismatched by design; LHC -type beam shows strong mismatch unexpected; Q26 is better than Q20
    • Try to get understanding with kick response measurements; a bit of fiddling needed with Aloha;
    • QIIF.1002 seems to stick out; seems to be something not correct and should be investigated more;
    • Verena - comparing the situation to the LSS bumpers; maybe there is just an offset; but this would be really high; could be magnet or PC issues;
    • Francesco waiting for results from fitting to dispersion; studies ongoing;
    • Hannes: what was the offset finally? ACTION: Kevin to get in touch with Loic and get details on the intervention; also how can EPC fix this on their side? Should not be doing kick response measurements to identify these items;
    • Hannes: is there another quadruple similar? Francesco: yes the QIIF.1004 is much weaker but also pops up in all optics; ACTION: Francesco to include QIIF.1004 in this analysis; H: initially you had the impression the FT corresponds well to the model? F: this is still the case;
  • Francesco: failure scenarios:
    • Tests done last week with Pieter on MKDV and MKDH to look at failure scenarios considered during design of dump system and make sure it behaves consistently;
    • Missing of 1 of the 3 MKDVs; missing one of the MKDHs; ensure that the beam is still well dumped;
    • Tests done for MKDV at 450 GeV and at 350 GeV (here we are on the full screen); checked dumped beam on BTV; dumps are fully consistent with expected positions; H: why does this change as the beam changes energy? F: because the voltage is still clamped slightly to be able to exploit the full dynamic range; we start clamping at around 400 GeV;
    • Tests done for MKDH: removed one after the other (adding the other two); the MKDH2 contributes almost twice from the other MKDHs; this was expected; speed of dilution still to e checked; all looks consistent;
    • Still to check TIDGV and its behavior;
    • F: last test is to check if we can simulate failure of BETS; ACTION: Francesco to investigate if and how we want to do this BETS failure mode;
  • Lotta - update on scrubbing:
    • Started taking MB beams from Monday; moved from 12 to 24 bunches; main limiting element is the MKDV; nevertheless, clear conditioning observed;
    • Tuesday trying to maximize beam dose, staying below pressure thresholds; moved to 36 bunches Tuesday night; did not hit any other evident limitations apart from the MKDV; there was some vacuum activity at different places around the arcs, but nothing significant;
    • e-cloud signals can be seen on the fresh liner;
    • K: there was a spike in 6, do we have any further information on this? L: there was nothing specific that could correlate with this spike;
    • H: there were some gauges (i.e., 16340) which behave strange; maybe Chiara could have a look; images in the logbook; ACTION: Chiara to check behavior of suspicious vacuum gauges;
  • Michael: damper commissioning
    • Timeline of commissioning - dry runs, parameter model, setting up of LHCPILOT; adjust clock parameters, signals calibration; closed loops on LHCPILOT, PU signals inverted to follow conventions in HLP; RF COEFF functions in V had to be switched;
    • SFTPRO: beam becomes unstable in V when damper is off; still needs to be further investigated;
    • ACTION: need a setting up procedure now; signals to be better exposed; VGs still missing; calibration factors can be cleaned up;
    • Verena: pickup calibration; how much is non-multiplexed? M: is we use the same module this should not change;
    • Verena: we have this issue having different trajectories for different batches and are wondering whether the damper is set 
  • Eric - RF conditioning:
    • Background - multi-pacting can cause sparks and degradation and damages to RF cavities or generators; conditioning essential to clean cavity surfaces;
    • Pulsed method to automatically and systematically condition RF cavities; very careful RF processing done; further conditioning must take place under operational conditions;
    • Old cavities have been in the machine and under vacuum for over 40 years; back then it took several months to get to some reasonable processing;
    • K: we need to be patient and we must not forget to do the conditioning;
    • H: where are we compared to where we should be? E: we are about at half of the power we can have;
    • ACTION: compute power levels and see how much more power is still needed (Eric, Kevin, Hannes)
  • Philippe - status:
    • SFTPRO orbit stability solved; AWAKE rephasing also solved; SFTOR with 4 islands taken and working so far;
    • New issues:
      • Cavity 6 has an issue; flips between 2 working points; need measurements without beam and might need tunnel access to fix;
      • RF gymnastics for AWAKE causes synchro loop to unlock and beams going unstable; ideas for reasons exist and are being further investigated;
    • Finalize physics beams:
      • SFTPRO, AWAKE
      • Scrubbing being prepared; systems are getting ready;
    • H: OTDFB is this operational? Ph: in the old system there were two different regulation loops, in the new system we only have the OTDFB, and this is operational; without this we have no control over voltage and phases;
    • Reyes: is there something specific that needs to be done for ions? Ph: we will have to change parameters, but it is designed to be fully compatible also for ions; once it is commissioned for ions, we will be able to use AM also on protons;
  • Nico - optimizer situation:
    • Explanation of tools and functioning, incorporation rules CONTANT_DECEND_IR, optimizer PyBOBYQA
    • Result: BCT optimization around transition, this could nicely be optimized;

Beam dump failure scenarios - outcomes (Francesco Maria Velotti)

Scrubbing run - first impressions (Lotta Mether)

Transverse damper commissioning - status (Michael Schenk)

RF conditioning - background, what can we expect, time scales, current status & tools (Eric Montesinos)

Status of RF commissioning - 25 ns beams (Philippe Baudrenghien)

Round Table & AOB

  • Issue with noise on BTVs - Stephane Burger:
  • Power: 8 MV maximum on single bunches without beam loading; 800 MHz during ramp even more unstable than before; we need 800 MHz; RF gymnastics needs to be done at high voltage otherwise you get S-shape; 1.6 MV on 800 MHz (maybe 2.4 MV);
There are minutes attached to this event. Show them.