LIU-SPS Coordination Meeting
Zoom
Present: Alexandre Lasheen, Andy Butterworth, Anthony Rey, Antonio Grande Mallavia, Arthur Spierer, Brennan Goddard, Carlo Zannini, Chiara Pasquino, Christine Vollinger, Christos Zamantzas, Danilo Quartullo, David Mcfarlane, David Nisbet, Elena Chapochnikova, Eric Montesinos, Kiki Veyrunes, Etienne Carlier, Fabio Follin, Francesco Maria Velotti, Francois-Xavier Nuiry, Frank Gerigk, Gerd Kotzian, Giovanni Rumolo, Giulia Papotti, Gregoire Hagmann, Hannes Bartosik, Heiko Damerau, Ivan Karpov, Ivan Romera Ramirez , James Ridewood, Johan Dalla-Costa, Johannes Bernhard, Julie Coupard, Kevin Shing Bruce Li, Leandro Intelisano, Loic De Oliveira, Lotta Mether, Luciana Kolbeck, Maciej Suminski, Marine Gourber-Pace, Michael Schenk, Nico Madysa, Nicolas Magnin, Paul Cruikshank, Philippe Baudrenghien, Reyes Alemany Fernandez, Simon Albright, Stephane Burger, Stephane Cettour Cave, Tom Levens, Verena Kain, Wolfgang Hofle, Yannick Le Borgne, Zisou Charilaos
- Actions
- Tests from CCC to study potential impact of PCs on BTVs
- Define procedure to deal with kicker thresholds for ramp
- Follow-up with magnet team and EPC to study orbit evolution and potential impact of different elements (extraction, TT10 quads,...)
- Repeat crystal loss reduction test with ZS and girders in
- Matters Arising
- Follow up also on strange gauges in 1 with Chiara
- Check power requirements
- BETS checks to be done
- Noise issue BA2/BA80 BTVs (Stephane)
- Quick explanation of BTV and how it works
- Tube based cameras are installed in TT20 and TDC2
- Re-installation was done in summer 2020, camera signals on screen looked good; test with beam in February 2021 became very noisy; tests were done to investigate noise; cables changed and images became better;
- After camera re-installation in 2021 - same noise occurred in TDC2; measurement had to be done manually, as signal was so noisy;
- How can we identify the source of this noise; are there similar issues elsewhere?
- There are same installation elsewhere that do not have this issues; some tests were done with OP to switch off items; frequency could come from power supplies;
- We need to take beam in 2 weeks, but we can also finish it off such that we can take beam; Federico mentioned that NA is also relying on the BTV images and for them; ACTION: schedule test from CCC to turn off power converters and check this;
- Update on BC planning (Kevin)
- Upcoming items: 4 batches at full flat bottom, after that acceleration of multi-bunch beams; do not forget to include steering to targets!
- Status of scrubbing (Lotta)
- Pressure evolution of MKDV show that device is clearly conditioning; though vacuum level is still far above operational interlock level;
- Limitations in 6 (61674) were lifted by raising the thresholds; now area is conditioning very well;
- E-cloud monitors fixed on Friday and gave nice e-cloud signals
- Full flat bottom with 72 bunches was reached on Saturday
- Several issues slowed down scrubbing a little (MKP not kicking, TT10 noise, BA5 valve 51301)
- Sunday took second injection with 48 bunches; since Tuesday injecting 2x72 bunches; main limitation from gauges in sector 5;
- V: we have special condition for coast - could we go to a lower energy; Etienne will think about this to start to work at beginning of the ramp; this needs to be checked;
- H: could one slightly raise the interlock levels to 1e-7? This might be feasible; Etienne will have to check this;
- ACTION: Etienne to think of mitigation measures to allow to move into the ramp next week;
- Orbit evolution through cycle - investigations of power supply ripples (Hannes)
- Strong ripple on closed orbit corrector; was not even seen on the orbit
- Effect of extraction elements on closed orbit are more disturbing though;
- All added elements increasingly make the rms orbit worse and cause the orbit around the machine to get unstable; part of it is from one of the extraction bumper in LSS4; it is not clear though whether this is just one single element; it seems like this concerns all extraction elements; even if these are regulated to zero, there is still a strong noise on them;
- No recurrence of similar observations in the past; needs to be followed up;
- Also, seems to be a difference between extraction bumper when powered off or to zero current;
- F: did we check how this corresponds to current? ACTION: Needs more follow-up and compare numbers in currents; F: should be done in parallel with quads in TT10;
- Loss reduction with crystal in LSS2 (Francesco)
- Crystal channeling commissioning was part of the beam commissioning this year to have it ready for operations; plan is to have TECS in operation;
- After a rocky start, the commissioning went very smooth; also tried automatic optimization which was successful;
- Commissioning procedure: angular scan for VR, then scan position which also contains information on ZS width; maximum of 45% loss reduction was reached at 70.6 mm position;
- Optimizer worked when action space sufficiently contained;
- V: might be good to do the same test with ZS and girders in; ACTION: repeat this test with ZS;
- Status of RF commissioning (AWAKE, SFTPRO, High Intensity) (Philippe)
- Little work on SFTPRO and AWAKE; 5 turns extraction done last week; SFTPRO to be revisited;
- AWAKE gymnastics with adiabatic voltage reduction and voltage jump done; synchronization with laser pulse still pending;
- BC uTCA power cycle recovery can be done automatically now;
- Physics beams getting urgent;
- Status of ALPS trajectory interlock (Andrea)
- Single bunch measurements improved - problems mostly in FW
- Trajectory interlock process is working, issues though with circular DDR buffer which are giving strange results; probably misinterpretation of data; SW fix underway for this;
- H: do we have a comparison of the noise level of this system with the MOPOS? V: it is much better now! A: looking at old data, we seem to be at least a factor 2 better;
- V: For the extraction interlock it would still be good if we could go to 0.5 mm interlock; for the moment we are still at 1 mm; A: this should be much better! Will need to look into this;