30 May 2022 to 3 June 2022
Campus des Cordeliers - Sorbonne Université
Europe/Zurich timezone

Simulation model for the FCC-ee Positron Source

2 Jun 2022, 18:22
2m
Réfectoire des Cordeliers

Réfectoire des Cordeliers

Poster (one author must be in person) Accelerators posters Poster session

Speaker

Fahad ALHARTHI

Description

The escalating interest of the future lepton colliders with high luminosity, draws the attention to the crucial role of the positron sources. One of these colliders is the FCC-ee. Two main positron production schemes (Conventional and Hybrid) are considered for the FCC-ee, will be discussed briefly here. The work is in progress for the development of positron generation and tracking model until the Damping Ring. The model starts with the production of positrons and target studies in GEANT4. After that, the generated positrons are tracked through the capture section composed of the matching device and several accelerating structures to accelerate the positrons until the energy of the Damping Ring. This part is implemented by using the code developed at CERN called RF-track. Eventually, the preliminary results for benchmarking of the FCC-ee positron source simulation model with the existed SuperKEKB positron source will be discussed.

Primary author

Co-authors

Iryna Chaikovska (CNRS/IJCLab) Mr Victor MYTROCHENKO Mr Eugene BULYAK Fusashi MIYAHARA Mr Yoshinori ENOMOTO Mr Andriy USHAKOV Yongke Zhao (CERN & Shandong University (CN)) Robert Chehab (INSTITUT DE PHYSIQUE NUCLEAIRE DE LYON-IN2P3/CNRS (France))

Presentation materials

There are no materials yet.