Sep 11 – 15, 2022
CERN
Europe/Zurich timezone

Operation Status and Upgrade Activities of TPS RF System

Sep 13, 2022, 2:00 PM
25m
80/1-001 - Globe of Science and Innovation - 1st Floor (CERN)

80/1-001 - Globe of Science and Innovation - 1st Floor

CERN

Esplanade des Particules 1, 1211 Meyrin, Switzerland
60
Show room on map
Oral presentation 20' + 5' Facility status reports Miscellanea

Speaker

Ming-Chyuan Lin

Description

The TPS RF system consists of two RF plants. each at a power level of 300-kW, for the electron storage ring operation. The system performance and statistics on trip events in the recent years are presented. To improve the RF performance, some activities such as digital low level RF system and solid state amplifier are developed and implemented, whereas a spare 500-MHz superconducting RF module is established and successfully tested with high power. Another upgrade activity on going is to develop a third-harmonic SRF module to lengthen the electron bunch. Current status of this third harmonic SRF module is also reported.

Primary authors

Dr Chih-Hung Lo (National Synchrotron Radiation Research Center) Mr Fu-Tsai Chung (National Synchrotron Radiation Research Center) Dr Hu-Yu Chang (National Synchrotron Radiation Research Center) Mr Ling-Jhen Chen (National Synchrotron Radiation Research Center) Dr Mei-Hsia Chang (National Synchrotron Radiation Research Center) Ming-Chyuan Lin Dr Zong-Kai Liu (National Synchrotron Radiation Research Center) Mr Meng-Shu Yeh (National Synchrotron Radiation Research Center) Mr Yi-Ta Li (National Synchrotron Radiation Research Center) Mr Shian-Wen Chang (National Synchrotron Radiation Research Center) Dr Chaoen Wang (National Synchrotron Radiation Research Center)

Presentation materials