08:30
|
Registration and opening
(until 09:00)
|
09:00
|
Facility status reports #1
-
Jorn Jacob
(until 10:45)
|
09:00
|
Status of the HIPA rf-system at PSI
-
Markus Schneider
|
09:25
|
Status and Operation of the ALBA RF System and developments for ALBA-II
-
Jesús Ocampo
|
09:50
|
ESRF RF system for the new ultra low emittance machine EBS: performance and upgrade projects
-
Jorn Jacob
|
10:20
|
The Plans and Status of the ALS-U RF Systems
-
Kenneth Baptiste
(LBNL)
|
10:45
|
--- Break ---
|
11:10
|
Solid state amplifiers #1
-
Daniel Valuch
(CERN)
(until 12:25)
|
11:10
|
CERN SPS RF SSPA, from design to operation
-
Eric Montesinos
(CERN)
|
12:10
|
Special requirements for high power SSA for the ESRF high current storage ring
-
Jorn Jacob
|
|
08:30
|
New projects
-
morten jensen
(European Spallation Source ERIC)
(until 09:45)
|
08:30
|
High Power RF for the EIC
-
Alex Zaltsman
|
08:55
|
PETRA III Upgrade to PETRA IV
-
Peter Huelsmann
|
09:20
|
RF SSAs for MINERVA, general architecture and main challenges
- Mr
Victor Martinez Illamola
(SCK CEN)
|
09:45
|
Passive devices
-
Daniel Valuch
(CERN)
(until 12:30)
|
09:45
|
RF distribution systems at ESS
- Mr
Walther Borg
(European Spallation Source ERIC)
|
10:10
|
ESS arc detector systems, development and experience
- Mr
Tomas Olsson
(European Spallation Source ERIC)
|
10:35
|
--- Break ---
|
11:05
|
Overview of the ITER high power CW Ion Cyclotron Range of Frequencies system and latest developments for its antennas
-
Walid Helou
(ITER Organization)
|
11:40
|
Overview of high power ferrite devices and key considerations for the design, operation and high-power testing of ferrite circulators
-
Carsten Weil
(AFT microwave GmbH)
|
|
08:30
|
Tube amplifiers and power supplies
-Mr
Kenneth Baptiste
(LBNL)
(until 10:10)
|
08:30
|
High voltage power supplies for RF amplifiers -
-
Davide Aguglia
(CERN)
|
09:20
|
The Proton Power Upgrade High-power Radiofrequency Systems
-
John Moss
(Oak Ridge National Laboratory)
|
09:45
|
ESS Klystrons: Installation, test and early experience
-
chiara marrelli
(ESS)
|
10:10
|
High Power RF systems Status and Operating Experience #1
-
Cristina Pasotti
(Elettra-Sincrotrone Trieste S.C.p.A.)
(until 12:30)
|
10:10
|
The Advanced Photon Source 350MHz RF Systems – 27 Years of Operation and Future Plans
-
Doug Horan
|
10:40
|
--- Break ---
|
11:10
|
FLASH HPRF System Upgrade
-
Stefan Choroba
|
11:35
|
Dual Klystron Driven Storage Ring RF System at Advanced Light Source
-
Angel Jurado
(LBNL) Mr
Kenneth Baptiste
(LBNL)
|
12:00
|
SSA Developments at SOLEIL
-
Massamba DIOP
|
|
08:00
|
Factory visit
(until 14:30)
|
|
18:00
|
Informal opening drink
(until 21:00)
(Rue de la Scie 2, 1207 Genève)
|
|
12:30
|
--- Lunch ---
|
14:00
|
Solid state amplifiers #2
-
Wolfgang Tron
(until 15:40)
|
14:00
|
Construction and Installation of a 320kW Solid State Power Amplifier for Taiwan Photo Source.
-
Fu-Tsai Chung
|
14:25
|
310 kW Solid State CW RF Amplifier for the NSLS-II Third RF System
-
Brian Holub
(Brookhaven National Laboratory)
|
14:50
|
Planning, requirements, features, vendor design and development status of 60kW 500 MHz AR RF HPA for ALSU project
-
Shree Subhasish Basak
(LBL)
|
15:15
|
Design Study on the Booster RF System with SSPA for KOREA-4GSR
-
Myunghwan CHUN
(PAL(Pohang Accelerator Laboratory)/POSTECH)
|
15:40
|
--- Break ---
|
16:10
|
Solid state amplifiers #3
-
James Rose
(until 17:00)
|
16:10
|
Design and Fabrication of the 20kW RF SSPA for the RAON SSR2
-
Kyungtae Seol
(IBS (Institue for Basic Science))
|
16:35
|
The ESS RF Systems: An overview and progress summary
-
morten jensen
(European Spallation Source ERIC)
|
17:00
|
Industrial presentations
(until 17:45)
|
17:05
|
Solid State amplifiers up to 350kW
- Mr
Carlos Rosa
|
17:10
|
High Stability Klystron Modulator for Commercial Accelerator Application
- Dr
Marcel Gaudreau
(Diversified Technologies, Inc.)
Michael Kempkes
|
17:15
|
New Solid State Power Amplifier will be soon merge both Broadband & Large-power performance
-
riichiro kobana
(R&K Company Limited)
|
17:20
|
Highly Reliable Industrial Solid-State RF Amplifier for Synchrotron Light Sources
-
Mirco Nedos
(Cryoelectra GmbH)
|
|
12:30
|
--- Lunch ---
|
14:00
|
Miscellanea
-
Alessandro Fabris
(Elettra)
(until 15:15)
|
14:00
|
Operation Status and Upgrade Activities of TPS RF System
-
Ming-Chyuan Lin
|
14:25
|
Is it possible to simplify the RF system of a multi-port cavity? The case of the NEWGAIN RFQ.
- Mr
Marco Di Giacomo
(CEA-GANIL)
|
14:50
|
CLS improvements and future goals
-
Denis Beauregard
(CLS)
|
15:15
|
--- Break ---
|
15:30
|
CERN facility visit
(until 18:25)
|
15:30
|
Group 1 BA3 visit
|
16:50
|
Group 1 SM18 visit
|
17:45
|
Group 1 leaving SM18 to restaurant
|
18:00
|
Group 1 apero in Andiamo
|
15:30
|
CERN facility visit
(until 18:25)
|
15:30
|
Group 2 coffee in the Globe
|
15:55
|
Group 2 SM18 visit
|
16:50
|
Group 2 BA3 visit
|
18:10
|
Group 2 leaving BA3 to restaurant
|
18:30
|
Beer and Sicilian pizza dinner
(until 23:00)
(Centre commercial Val Thoiry. 1401 rue de la gare, Thoiry)
|
|
12:30
|
--- Lunch ---
|
14:00
|
High Power RF systems Status and Operating Experience #2
-
Markus Schneider
(until 15:40)
|
14:00
|
Addition of a 3rd 500MHz system to NSLS-II
-
James Rose
|
14:25
|
The ESS MEBT 30 kW solid state amplifiers
- Mr
Bruno Lagoguez
(European Spallation Source ERIC)
|
14:50
|
Operational experience with CW klystrons at CERN (LHC and Linac4)
-
Nuria Catalan Lasheras
(CERN)
|
15:15
|
Radio Frequency RF Power Stations (RFPS) at ESS: Installation and Initial operating experience
-
Rutambhara Yogi
|
15:40
|
--- Break ---
|
16:10
|
Facility Status Reports #2
-
Ming-Chyuan Lin
(until 17:30)
|
16:10
|
ESS-Bilbao new developments in RFQ coupler and a novel SSPA power source for our ECR ION source
-
Arash Kaftoosian
|
16:35
|
Status and plans of the RF renewal in the framework of the Swiss Light Source upgrade (SLS2)
-
Marcos Gaspar
(Paul Scherrer Institut)
|
17:00
|
Commissioning of 400 kW 352 MHz Amplifiers for ESS ERIC
-
Cristina Pasotti
(Elettra-Sincrotrone Trieste S.C.p.A.)
|
17:30
|
Close out
(until 18:00)
|
|
|