Indico celebrates its 20th anniversary! Check our blog post for more information!

5–9 Jun 2023
Millennium Gloucester Hotel London Kensington
Europe/London timezone

Top-up injection baseline scenario

6 Jun 2023, 09:00
30m
Orchard Suite

Orchard Suite

Oral presention (by invitation only) FCC-ee accelerator FCC-ee accelerator (FCCIS WP2)

Speaker

Yann Dutheil (CERN)

Description

The FCC-ee collider requires continuous injection not only to maximize the average luminosity but also to ensure the stability of the beams by maintaining the charge of colliding bunches. The full energy booster will accelerate electron and positron beams to the collider energy which will then be injected into the collider ring.

Several schemes are being studied but a conventional top-up bumped injection scheme has been identified as the current baseline scenario. This contribution presents the status of that scheme and its integration into the present collider lattice. Potential hardware choices will also be presented to account for realistic operation scenario as well as possible failure cases and related machine protection considerations.

Primary author

Co-authors

Presentation materials