The FCC-ee will be the largest accelerator ever built and it requires to be connected to the European grid for electricity supply. The power demand is a key parameter to define the grid connection. The identification of the main loads was performed and presented in 2022 as well as the energy consumption depending on the machine configurations. The studies for grid connection were launched based on these numbers and the results will be presented. Last changes and optimisation of the machine parameters will be presented with their impact on the grid connection