Speaker
Fani Valchkova-Georgieva
(Bulgarian Academy of Sciences (BG))
Description
Following up the updates on RF section studies, the integration studies focus on a new integration scenario where the Collider RF elements (400MHz and 800 MHz cryogenics modules) will be installed at point H, and Booster RF elements (800 MHz cryogenics modules) will be installed at point L. The integration studies is taking into account boundaries in term of space limitations and design requirements, such as straight section length, cryogenics modules length, general services (electrical, cooling and ventilation), reserved volumes (transport, and alignment). All systems shall fit in the 5.5m inner diameter tunnel.
Author
Fani Valchkova-Georgieva
(Bulgarian Academy of Sciences (BG))