8–13 Aug 2011
Rhode Island Convention Center
US/Eastern timezone

Combined CDF and D0 upper limits on MSSM Higgs boson production in in proton-antiproton collisions at the Tevatron

12 Aug 2011, 10:30
20m
555 (Rhode Island Convention Center)

555

Rhode Island Convention Center

Parallel contribution Higgs Physics Higgs Physics

Speaker

Louise Suter

Description

We present combined results on the search for a neutral Supersymmetric Higgs bosons with data collected at the CDF and D0 experiments. Data were collected in proton-antiproton collisions at a centre of mass energy of 1.96 TeV during Run II of the Tevatron. The searches considered cover the main production and decay mechanisms for Higgs bosons in tau and bottom quark final states. The resulting combination is interpreted in the context of different scenarios within the Minimal Supersymmetric Standard Model.

Primary author

Presentation materials