• A review of the construction schedule, including possible ways to reduce the schedule by about 6 months for each sector.
• The calculation of contractor’s profit.
• Possible alternative technical solutions such as permanent shotcrete for some areas of the underground.
• Consequence of constructing only two experiment caverns.
• Future collaboration between CERN and ILF.
• Use of TILOS and reporting features of TILOS.