FCC Cost & Schedule Study - ILF Zurich Meeting

Europe/Zurich
    • 1
      Agenda

      • A review of the construction schedule, including possible ways to reduce the schedule by about 6 months for each sector.
      • The calculation of contractor’s profit.
      • Possible alternative technical solutions such as permanent shotcrete for some areas of the underground.
      • Consequence of constructing only two experiment caverns.
      • Future collaboration between CERN and ILF.
      • Use of TILOS and reporting features of TILOS.