Machine Development plans at the LHC

22 Jun 2011, 09:30
20m
6/2-024 - BE Auditorium Meyrin (CERN)

6/2-024 - BE Auditorium Meyrin

CERN

6-2-024
120
Show room on map

Speaker

Dr Frank Zimmermann (AB/ABP)

Description

Since spring 2011 regular machine development (MD) periods are scheduled for the LHC. Presently a year of LHC running features about five blocks of 5 days each of dedicated machine studies, which are aimed at calibration and validation, at improving operational procedures, or at preparing for future operation modes as well as for future upgrades. An overview is given of the LHC MDs performed so far, including a few key results, and the future plan is described, with particular emphasis on items related to optics control.

Presentation materials