Conveners
LHC complex present and future plans
- Massimo Giovannozzi (CERN)
Description
- Introduce the planned upgrades and future projects new challenges for optics modeling and beam instrumentation?
- Are the optics challenging enough?
Dr
Frank Zimmermann
(AB/ABP)
22/06/2011, 09:30
Since spring 2011 regular machine development (MD) periods are scheduled for the LHC. Presently a year of LHC running features about five blocks of 5 days each of dedicated machine studies, which are aimed at calibration and validation, at improving operational procedures, or at preparing for future operation modes as well as for future upgrades. An overview is given of the LHC MDs performed...