11:00
|
Approval of the upload of lists of equipment to the Layout Database - UW and US
-
Miguel Navarro Baeza
(CERN)
|
11:15
|
Integration status of the 120A PCs (WP15 Area Integration Reports and WP6B Engineering Specification)
-
Miguel Navarro Baeza
(CERN)
|
11:30
|
Integration status of the 60A PCs (WP15 Equipment Integration Note)
-
Miguel Navarro Baeza
(CERN)
|
11:45
|
AOB: HL-LHC integration viewers and tunnel CATIA split models references
-
Miguel Navarro Baeza
(CERN)
Francesca Paola Nicoletti
(CERN)
|