HI-ECN3 target complex handling equipment

Europe/Zurich
CERN

CERN

Jean-Louis Grenard (CERN)
  • The 45 ton in building 911 is actually fitted with a double motor on the hoist; this allows redundancy in case the main motor fails
  • The replacement of the lift in bldg.911 is scheduled from 25/11/2024 to 24/02/2025
  • The lift in bldg. 912 has been replaced in 2020 and no other work is needed
There are minutes attached to this event. Show them.