Dr Ralph Wolfgang Assmann (CERN)14/06/2011, 09:30
-
Dr Stefano Redaelli (CERN)14/06/2011, 09:35Collimation system description: multi-stage cleaning, different planes, betatron and momentum. Definition of cleaning efficiency. Introduction quench limit. Hierarchy. Limiting physics processes: single-diffractive p scattering, ion fragmentation, ... Comments on hollow e-beam scrapers.Go to contribution page
-
Daniel Wollmann (CERN)14/06/2011, 10:00How is it adjusted? How does it perform in LHC (loss maps: measurement and simulation). MD results at 3.5TeV and performance reach at 7TeV. Losses in luminosity production (dispersion suppressors). Measurement protons vs ions. Minimum beam lifetime. First SPS results BPM’s in jaws.Go to contribution page
-
Markus Brugger (CERN)14/06/2011, 10:50Issues with radiation to electronics in LHC, with focus on collimation insertions. IR7 versus IR3 sensitivity. Benefit of moving losses from IR7 to IR3.Go to contribution page
-
Roderik Bruce (CERN)14/06/2011, 11:10Stability of LHC machine (orbit, beta). Required margins for collimation setup. Connection collimation to beta*. What beta* can be achieved? Origins of limitations: protection condition, infrequent collimation setups, machine drifts.Go to contribution page
-
Mr Anton Lechner (Atomic Institute of the Austrian Universities, TU Vienna)14/06/2011, 11:30FLUKA models and predictions. Comparison between measurements and simulations. Safety margins.Go to contribution page
-
Alessandro Dallocchio (CERN)14/06/2011, 11:50Short description phase 1 design. Second generation collimators. Improved jaw materials. Collimators for cryogenic regions (warm/cold solution).Go to contribution page
-
Keith Kershaw (CERN)14/06/2011, 12:15Highlights from work for collimation remote handling and remote survey. Plans.Go to contribution page
-
Steve Myers (CERN)14/06/2011, 14:00
-
Dr Ralph Assmann (CERN)14/06/2011, 14:05Outline of collimation upgrade plan. What is planned when and why? What are the questions arising for this upgrade plan?Go to contribution page
-
Vittorio Parma (CERN)14/06/2011, 14:35Foreseen work in IR3 for first long shutdown? Short description. Planning aspects.Go to contribution page
-
Adriana Rossi (CERN)14/06/2011, 14:55What is lost when not doing the IR3 upgrade? Gain from DS collimators. Performance reach without (see also morning presentation) and with dispersion suppressor collimators for protons.Go to contribution page
-
Giulia Bellodi (CERN)14/06/2011, 15:15Ion performance reach without and with dispersion-suppressor collimators in IR3. Other ion limitations (IR2, ...). Possible impact from delay of IR3 work on IR2 upgrade of dispersion suppressors.Go to contribution page
-
Dr Vittorio Boccone (CERN)14/06/2011, 15:50Predicted energy deposition with and without IR3 dispersion suppressor collimators. Gain from collimators. Performance reach from comparing peak heat deposition with quench limit. Comparison with MD results.Go to contribution page
-
Nicolas Mounet (Ecole Polytechnique Federale de Lausanne (EPFL)-Unknown-Unknown)14/06/2011, 16:10Impedance from tight collimation settings as achieved in MD. Will the beams be stable with impedance, taking into account stabilization from transverse damper and octupoles?Go to contribution page
-
Philippe Lebrun (CERN)14/06/2011, 16:30Conclusions from May review in EN/TE departments. Technical feasibility? Major risks? Any show-stoppers identified?Go to contribution page
-
Stefan Roesler (CERN)14/06/2011, 16:55Expected activation levels. Are additional limits expected on work in dispersion suppressors during later shutdowns?Go to contribution page
-
Dr Davide Tommasini (CERN)14/06/2011, 17:15Can the radiation dose on unprotected magnets in the dispersion suppressors be accepted? What is the radiation hardness and can unacceptable damage to magnets be excluded, for protons and ions?Go to contribution page
-
Oliver Aberle (CERN)
-
Markus Brugger (CERN)
-
Oliver Aberle (CERN)Work in the long-straight section of IR3. Implementation of combined betatron/momentum cleaning. Work involved.Go to contribution page
Choose timezone