19–23 May 2025
Hofburg Vienna
Europe/Vienna timezone

Ventilation update for FCC

22 May 2025, 13:30
23m
Trabantenstube

Trabantenstube

(a) Talk abstract only Technical Infrastructures Technical Infrastructure

Speaker

Inigo Martin Melero (CERN)

Description

The ventilation system for the FCC is designed to supply, condition, and extract air throughout the entire accelerator complex. This includes the Technical Areas, Experimental Areas, RF Areas, the Tunnel, and surface buildings. The supplied air must comply with safety, humidity, and temperature standards. This presentation will provide an overview of this system, with a focus on the updated thermal loads to air, the integration of ventilation within the various facilities and the alternative longitudinal ventilation concept proposed of the Tunnel.

Author

Presentation materials