As part of the FCC feasibility study, the installation schedule for the FCC-ee has been aligned with the updated Civil Engineering strategy for the tunnel construction. Fine tuning between the two schedules was carried out to optimize the overall installation duration, allowing machine installation activities to safely begin while the final phases of Civil Engineering works are still being completed. The sequence of technical infrastructure installation was analyzed and quantified, drawing on lessons learnt from the HL-LHC project, to refine the estimated installation for some critical items such as high-voltage cables between access points. Particular attention was also given to the sequencing of multiple systems installation at the dedicated points to the Radiofrequency (RF) system. The presentation provides an overview of the integrated FCC-ee schedule, summarizing the Civil Engineering works installation blocks and detailing the installation of beamlines and associated general services up to the commissioning phase, incorporating analysis performed in collaboration with the equipment groups.
Looking further ahead, a preliminary schedule for the dismantling of FCC-ee and the subsequent FCC-hh installation will be presented, offering a broader perspective on the overall project timeline.