Description
From 9:00
- Visit of Falcon D delivered tool components, winding line, heat treatment station, impregnation station, All ( 60 mins)
From 9:50 ( video link for external collaborators)
1- Status of CERN component production for Falcon D INFN, CERN (10 mins)
2- Overview of FALCON D CERN, Status of CERN mock ups, model for Falcon , CERN, schedule ( 15 mins)
3- Detail CAD model design of winding mandrel, poles fixture, HT mould, impregnation molds, ASG (20mins)
4- Status of tooling production, delivery, NC, commissioning ASG plan – ASG ( 20 mins)
Tooling drawing list , archive for approval by INFN, CERN – ASG (15 mins)
5- Exchange of tooling CAD mode of coil specific tooling, list, plan, ASG, Alessio Verardo (20 mins)
6- Status of CERN tooling design model, open items – CERN, L Gentini, (25 mins)
7- Open issues on coil design, insulation drawings ( discussion on 11T and QXF examples) – ASG, all, 15 mins
8- Overall schedule of coils fabrication – ASG, Alessio Verardo, Stefania Farinon, 10 mins
9- Overall plan, schedule of first mock up, structure components procurement – Stefania Farinon, Massimo Sorbi, 10 mins (postponed)