To be followed up:

  • short prototype - validation, measurements (wire tension, straw straightness, HV, ...), FE board
  • Toshiba wire investigation - results
  • long prototype - Alu tube measurements - results, update drawings of flanges, launch the production
  • Minitubes crimp tubes investigation - results
  • measure alignment of spacers in the intermediate prototype
  • updated HV board drawing from Vincent with the central hole 
  • documentation of procedures and results
There are minutes attached to this event. Show them.
    • 09:00 10:00
      Updates 1h

      Short prototype:

      Michal:

      • started writing documentation in Overleaf
        • crimping procedure
        • notes from Zuzana and Hans
        • Hans: store on EDMS
      • VNA analysis failed (not conclusive)
        • idea: build a different setup with custom boards
      • HV test with gas flow
        • 5 h at 1800V - one discharge
        • 1900V - immediately a lot of discharges
        • don't know where the discharges are - investigation needed
        • the current without discharges is <1nA
        • HV connectors were tested in 2019 (Peter) - no issue with HV up to 2kV
        • possible issues with cleanlines of HV board or connectors (Johan)

       

      Hans:

      • need to document the results of all tests - EDMS

       

      Peter: 

      • found a good chip for the charge preamp board, waiting to receive the board

       

      Johan:

      • design of the evaluation board (not for the HV) is almost finished (2.4 mm PCB)
      • it is expected to have several rounds of tests to get the final design
      • 5-6 weeks waiting time

       

      Intermediate prototype:

      Tonio:

      • Dubna straws 19um hold 4.5 bar pressure (absolute) at least

       

      Michal:

      • wants to measure straw sag as a function of straw tension
        • not great with a device from Neil
        • different idea with laser

      Hans:

      • is it clear that the spacers are perfectly aligned with the frame?
      • you can measure it with a wire
      • need to document the results of all tests - EDMS

      Long 124-straw prototype:

      Vincent:

      • provided step files for parts masking the Ultem parts before coating
      • provided solution for central pillar supporting the HV board

       

      Peter: 

      • pillar for HV board - bottom part plastic, top part metal would be OK, size is OK
      • needs and updated version of the HV board "design"

       

      Zuzana:

      • Minitubes crimp tubes 
        • investigation of a blocked tube ongoing
        • need to review copper hardness and tolerances
        • asked Tonio&Francois to perform a pull test on 3 crimp tubes
      • Ultem parts (HV plugs)
        • investigating possibility to sputter just the underlayer (Ti + 3um Cu) and electroplate the gold layer
          • this will require a change in the outer diameter (+10-15um on diameter due to copper underlayer)
          • should be cheaper
          • need to be tested as bath might not be an option due to scratching of parts

       

      Hans:

      •  no news from Francisco about the spacers - will contact the company again
      • no news from the main workshop about the supporting tube
      • asked Temur to make 12um straws (Michal gave 3 spools 12um to Lamina) after they make more 19um before Christmas