Straw bi-weekly meeting

Europe/Zurich
20/1-004 (CERN)

20/1-004

CERN

15
Show room on map
Hans Danielsson (CERN)
From the same series
Zoom Meeting ID
69461503392
Host
Zuzana Kucerova
Useful links
Join via phone
Zoom URL
    • 10:45 11:45
      Updates 1h

      Big board for the long prototype - to be tested with gas

      Short prototype - HV stability issues understood - bug in the design of HV board, can be fixed on the existing boards by applying glue in a problematic groove, new boards are already correct

                                   - Signal - pedestal = average between 0.3-0.6 ms

                                                 - saturated signals are observed with voltage above 1450V - Michal K. confirmed that the same was seen with NA62 straws only in b154, not in the cavern

                                   - Channel 1 is different - not understood (not wire tension, no known difference between this straw and others)

                                                                             - wire tension whould be remeasured

                                                                             - measure with Fe55 in different positions along the straw

                                                                             - 70um kapton tape used to disconnect this channel for further measurements

                                   - stable pedestal values

                                   - all measurements are done with termination board

                                   - trailing time resolution is about 7ns (for straws 2-4)