28 September 2026 to 2 October 2026
Castelldefels, Barcelona, Spain
Europe/Zurich timezone

Session

Systems

29 Sept 2026, 15:20
Castelldefels, Barcelona, Spain

Castelldefels, Barcelona, Spain

Hotel Rey Don Jaime

Presentation materials

There are no materials yet.

  1. Christophe Hoarau (LPSC/IN2P3/CNRS)
    29/09/2026, 15:20
    System - System Design, Description and Operation
    Oral

    This presentation focuses on the readout electronics for SiPMs and diamond detectors, for real-time monitoring of dose deposition in proton therapy. The principle of particle trajectory reconstruction relies on precise timing measurements, i.e. to achieve millimetre-scale resolution, measurements must be accurate to within 100 ps. To meet this requirement, we have developed 50 channels signal...

    Go to contribution page
  2. Luigi Guiducci (Universita e INFN Bologna (IT))
    29/09/2026, 15:40
    System - System Design, Description and Operation
    Oral

    In March 2025 the muon system of the SND@LHC detector was upgraded with Mini Drift Tubes modules. The contribution will describe the new detectors, smaller versions of CMS Drift Tubes, and the electronics for the triggerless time-to-digital conversion and readout, based on the OBDT-theta board for the Phase2-upgrade of CMS Drift Tubes and on a VCU118 board as a backend system. The integration...

    Go to contribution page
  3. Riccardo Paramatti (Sapienza Universita e INFN, Roma I (IT))
    29/09/2026, 16:00
    System - System Design, Description and Operation
    Oral

    The CMS Electromagnetic Calorimeter (ECAL) barrel is being upgraded for HL-LHC operation while preserving its existing PbWO₄ crystals and APDs. The readout electronics have been fully redesigned to sustain trigger rates up to 750 kHz, increased latency, higher radiation levels, and improved timing performance. New front-end ASICs provide dual-gain amplification, 12-bit digitization at 160...

    Go to contribution page
  4. Michael Lupberger (University of Freiburg (DE))
    29/09/2026, 17:40
    System - System Design, Description and Operation
    Oral

    Within LS4, the LHCb experiment will undergo its major Phase-IIb upgrade. The spectrometer's downstream SciFi tracker will be replaced by a hybrid detector designed to handle higher occupancies and radiation levels. The central high-occupancy regions will employ Monolithic Active Pixel Sensors, while the outer regions will use Scintillating Fibres read by cryogenically cooled Silicon...

    Go to contribution page
  5. Michela Greco (Universita e INFN Torino (IT))
    29/09/2026, 18:00
    System - System Design, Description and Operation
    Oral

    The INFN SPECTRE (Single Photon Emission Computed Tomography Readout Electronics) project aims to design, assemble, and characterize a complete detection module based on CZT sensors for medical applications. For readout, SPECTRE uses the electronics developed for a high-capacitance gas detector (CGEM@BESIII, IHEP, Beijing): the TIGER (Torino Integrated GEM Electronics for Readout) ASIC for...

    Go to contribution page
  6. Ignacio Redondo Fernandez (CIEMAT - Centro de Investigaciones Energéticas Medioambientales y Tec. (ES))
    30/09/2026, 09:00
    System - System Design, Description and Operation
    Oral

    The BMTL1 system is the trigger and readout backend of the CMS Barrel Muon during HL-LHC. 30 custom design ATCA bmtl1 boards generate station primitives running complex logic on VUP13 FPGAs using the full precision data sent by the upgraded frontend of the muon detector. A second layer of 12 bmtl1 boards aggregates wedges easing the transition to TMT-18 scheme used by next trigger layers. Its...

    Go to contribution page
  7. Alberto Perro (CERN)
    30/09/2026, 09:20
    System - System Design, Description and Operation
    Oral

    A primary challenge in High Energy Physics (HEP) data acquisition is the aggregation of numerous low-speed (10Gb/s) radiation-hard data links into high-speed back-end interfaces. While high-end FPGAs traditionally perform this task, transceiver density and speed in modern devices can limit cost-effective scaling. This study proposes a two-stage architecture that utilizes mid-range FPGAs for...

    Go to contribution page
  8. Yifan Yang (Universite Libre de Bruxelles (BE))
    30/09/2026, 09:40
    System - System Design, Description and Operation
    Oral

    Scalable communication is needed for PEPS,a future gamma-ray array of 10
    km2 with 55 solar-powered detector stations per km² at the Pierre Auger
    Observatory. With the legacy access radio unavailable for PEPS, we propose a two-tier architecture: a 2.4 GHz FLRC fixed-slot first-hop layer from stations to a per-cell aggregation node, followed by 5 GHz backhaul to the DAQ. Separating access from...

    Go to contribution page
Building timetable...