ACTION : 

  1. Activated shielding blocks - Proceed cautiously regarding the swap. Discuss with Y. Pira and confirm the need — T. Zickler
  2. Contact Goran to organize an ITM training — G. Riddone
  3. Buffer zones - Confirm the related constraints: need for physical demarcation (ex: concrete blocks); avoiding additional shielding is preferred whenever possible — T. Zickler
  4. Publish in EDMS the new layout and associated requests for review and comments next week — Halbert / G. Riddone
  5. Prepare a proposal for the storage of the blocks currently located on the B955 mezzanine — S. Pelletier
  6. Bunker B954 - Meet and propose the final configuration — C. Halbert / Y. Pira
  7. Kiosk - Create the required zones — C. Halbert / A. Foraz
There are minutes attached to this event. Show them.
    • 14:30 14:40
      Approval of previous minutes and review of actions 10m

      https://edms.cern.ch/project/CERN-0000279699

      Speaker: Dr Germana Riddone (CERN)
    • 14:40 14:50
      General news 10m

      SPSX-PM-MG-0063 v.0.1 "LS3 Logistics" by Deepti Kandhol in status: Engineering Check
      This document provides a consolidated overview of logistics requirements for the NA-CONS project ...
      Link: https://edms.cern.ch/document/SPSX-PM-MG-0063/0.1/approvalAndComments

      BA80
      considering the significant transport activities already taking place and planned to and from Building 954,

      From September onwards, a large number of NA-CONS activities will start, including works in front of BA80. In addition, the entire area will be fenced off as a Category 1 worksite, and access will require prior authorization.

      Would it be possible to use the other doors located on the south-west side of Building 954?

      Request EN-CV-Jani Lehtinen

      I am writing because there have recently been discussions regarding the reservation of long-term storage space for demineralized water cartridges in Building 954. I replied to Thomas that we had not submitted a request because, from our perspective, this activity is not related to LS3 project storage but rather to the day-to-day operation of our EN/CV installations. The management of demineralized water cartridges has been governed by an agreement between EN/CV and RP for many years.

      Unless I am mistaken, there are currently 95 demineralized water cartridges stored in Building 954. The cartridges can be sent to Building 378 for processing once the dose rate is below 0.1 µSv at 10 cm. However, I am not aware of the current status.

      With the work on the SPS ED stations, we will need to place approximately 15 additional cartridges into storage. I am not aware of the current situation regarding the PS or LHC stations.

      Support Structure Calculation and Validation
      On 09/06, SCE and HSE held a meeting and agreed on the additional items to be included in the calculation report. The calculation report is almost complete and is expected to be finalized by 12/06. Once completed, the document will be submitted to HSE for review and validation.

      NA-CONS waste TF
      https://indico.cern.ch/event/1695111/contributions/7128169/attachments/3292716/5888006/NA%20Radioactive%20Waste%20Task%20Force%20-%20Magnet.pptx
      6 TCC2 magnets spare to be out before 09/2026

      Speaker: Dr Germana Riddone (CERN)
    • 14:50 15:00
      Update of the requests and update of layouts 10m
      Speaker: Cedric Halbert
    • 15:00 15:15
      Tranfert of assets from B879/954/955 to other storage buildings and to B157 15m
      Speakers: Cedric Halbert, Elsa Clerc (CERN)
    • 15:15 15:30
      Dashboard of 879/954/955 15m
      Speaker: Alexandre Foraz
    • 15:30 16:00
      Status of the support structures 30m
      Speaker: Julien Prosic
    • 16:00 16:10
      AOB 10m