17–21 Sept 2012
Oxford University, UK
Europe/Zurich timezone

Session

B3a

Systems
19 Sept 2012, 09:45
Oxford University, UK

Oxford University, UK

<font face="Verdana" size="2"><b>Clarendon Laboratory</b> Parks Road OX1 3PU, Oxford, United Kingdom

Conveners

B3a: Systems, Planning, installation, commissioning and running experience

  • Ken Wyllie (CERN)

Presentation materials

There are no materials yet.

  1. Dr Markus Friedl (Austrian Academy of Sciences (AT))
    19/09/2012, 09:45
    Oral
    The Silicon Vertex Detector of the future Belle II experiment at KEK (Japan) will consist of 6” double-sided sensors. Those are read out by APV25 chips (originally developed for CMS) which are powered by DC/DC converters with floating low voltages on top of the bias potentials. The signals are transmitted by cable links of about 12 meters. In the back-end, the data are digitized and processed...
    Go to contribution page
  2. Andrea Boccardi (CERN)
    19/09/2012, 10:10
    Oral
    The Beam Instrumentation Group (BI) is responsible for designing, building and maintaining the instruments that allow observation of the particle beams and the measurement of related parameters for all CERN accelerators and transfer lines. This contribution is aimed to give an overview of the ongoing electronic developments within the beam instrumentation group both to improve the performances...
    Go to contribution page
Building timetable...