    • 14:00 → 14:05
      General news - Review of minutes 5m

      https://proton-journey.web.cern.ch/

      Speakers: Erwin Siesling (CERN), Hanne Heylen (CERN), Joachim Vollaire (CERN)
    • 14:05 → 14:15
      Safety matters 10m

      https://home.cern/tag/ls3-safety-spotlight/

      Speakers: Andreas Herty (CERN), Hanne Heylen (CERN), James Devine (CERN), Joachim Vollaire (CERN)
    • 14:15 → 14:20
      IBDRS project update - Work in the primary areas - BTY line @ 2 GeV 5m

      FCEN adaptation for work in Build. 197 last week. Minutes to be circulated.
      CMAC visit in the target area 17/11
      Reception civil engineerign work PS Booster after ITC

      Speakers: Ana-Paula Bernardes (CERN), Joachim Vollaire (CERN), Melania Averna (CERN)
    • 14:20 → 14:25
      RILIS Laboratory upgrade project - Exhaust gas line re-routing - activities update 5m
      Speakers: Carlotta Porzio (CERN), Katerina Chrysalidis (CERN), Laura Lambert (CERN), Sebastian Rothe (CERN)
      • Vac pipe work
        • consignation done yesterday
        • Installation of pipe traversing GPS/HRS walls done - leak tests of the individual 6 pipes done 
        • Tomorrow installation of scaffolding inside HRS and GPS
        • Next week cutting
      • Boris tube
        • Tomorrow installation of support beams
        • Friday drilling
      • Optical tables
        • Potential delay in delivery - TBC if can still be installed this year
      • HRS door
        • Cylinder has been moved to the new door to allow for security follow up during their rounds
    • 14:45 → 14:55
      Mechanical Workshop and other support requests 10m
      Speaker: Oscar Fjeld (CERN)

      Completed work:

      • COLLAPS replacement slide (187) – A bronze slide was machined to replace the aluminium original.

       

      • ISOLTRAP ground electrode (186) – The electrode was turned to fit its support.

       

      • HRS/GPS pipe holder (198) – The pipe holder was adjusted.

       

      Design work:

      • Miniball preamplifier box support (190) – A removable holder was modelled. Box removal and clearance around the connectors were checked in CAD.

       

      New requests:

      • RILIS shielding cover (197) – Make a sheet-metal cover for the side facing HRS.
      • RC6 MRTOFMS support (199) – Anchor the support to the floor.
      • COLLAPS cable tray (200) – Cut the cable tray on the COLLAPS side of Building 170.
    • 14:55 → 15:00
      Planned visits and AOBs 5m
      Speaker: Hanne Heylen (CERN)
      • F. Wenander asks about removal of pillar with electrical distribution box which appeared:
      • Return helmets to entrance platform/EPC platform cage, thanks :-)
      • Visits:
        • 4p request for Monday 23rd 10h --> to be seen with concrete pillar removal
        • Request by KULeuven for Tuesday 1st of December - could we change location of for this meeting?
        • Guided tour for Czech journalists on 25/11, during the ISOLDE workshop