DAQ and Control Workshop

from Monday 23 July 2007 (10:00) to Wednesday 25 July 2007 (14:00)
RAL

        : Sessions
    /     : Talks
        : Breaks
23 Jul 2007
24 Jul 2007
25 Jul 2007
AM
10:00
Day 1 (until 14:00) (CR13 - R68)
10:00 DAQ System Requirements - Jean-Sebastien Graulich (University of Geneva)  
Paper
10:30 Trigger System Requirements - Jean-Sebastien Graulich (University of Geneva)  
11:00 Online Monitoring Requirements - Dr Malcolm Ellis (Fermilab)  
Slides
11:20 Online Reconstruction Requirements - Dr Malcolm Ellis (Fermilab)  
11:40 Update on Detector Installation Plan  
12:20 --- break ---
09:00
DATE Tutorial (until 12:30) (R12 (East))
09:00 System Requirements  
09:20 Installation Procedure  
09:40 Typical Installation Problems  
10:00 DATE Database  
10:20 DATE Network  
11:00 DATE Processes  
11:20 RunControl Human Interface  
11:40 Disconnected and Connected Configurations  
12:00 Equipments  
09:00
Day 3 (until 10:00) (CR13 - R68)
09:00 Data Unpacking - DATE - Jean-Sebastien Graulich (University of Geneva)  
Slides
09:20 Data Unpacking Software - G4MICE Design - Dr Malcolm Ellis (Fermilab)  
Slides
09:40 Plan for the DAQ System Review - Prof. Alan Bross (Fermilab)  
10:20
DAQ System Training (until 12:30) (R12 (East))
10:20 Minimal System Configuration  
10:40 Minimal Trigger System  
11:00 Getting Data  
11:20 Unpacking Data  
11:40 Developing Readout Code  
12:00 Developping Unpacking Code  
PM
14:00
Day 2 (until 18:00) (CR13 - R68)
14:00 Online Database  
14:20 Update on MICE Control Room Installation - Paul Kyberd (Departm.of Physics(QMW-Coll.))  
14:40 Data Saver - The Minos Example - Mr Matt Thorpe (RAL)  
Poster
15:00 Status of AFEII-t and VLSB firmware - Mr Terrence Hart (Illinois Institute of Technology)  
15:30 Update on Tracker Sytem / DAQ System interface - Dr Craig McWaters (RAL)  
Slides
16:00 --- break ---
16:30 AFEII-t Initilization and Control - James Leaver (Imperial College London)  
Slides