10:00 AM
|
Day 1
(until 2:00 PM)
(CR13 - R68)
|
10:00 AM
|
DAQ System Requirements
-
Jean-Sebastien Graulich
(University of Geneva)
(CR13 - R68)
|
10:30 AM
|
Trigger System Requirements
-
Jean-Sebastien Graulich
(University of Geneva)
(CR13 - R68)
|
11:00 AM
|
Online Monitoring Requirements
- Dr
Malcolm Ellis
(Fermilab)
(CR13 - R68)
|
11:20 AM
|
Online Reconstruction Requirements
- Dr
Malcolm Ellis
(Fermilab)
(CR13 - R68)
|
11:40 AM
|
Update on Detector Installation Plan
(CR13 - R68)
|
12:20 PM
|
--- break ---
|
|
9:00 AM
|
DATE Tutorial
(until 12:30 PM)
(R12 (East))
|
9:00 AM
|
System Requirements
(R12 (East))
|
9:20 AM
|
Installation Procedure
(R12 (East))
|
9:40 AM
|
Typical Installation Problems
(R12 (East))
|
10:00 AM
|
DATE Database
(R12 (East))
|
10:20 AM
|
DATE Network
(R12 (East))
|
11:00 AM
|
DATE Processes
(R12 (East))
|
11:20 AM
|
RunControl Human Interface
(R12 (East))
|
11:40 AM
|
Disconnected and Connected Configurations
(R12 (East))
|
12:00 PM
|
Equipments
(R12 (East))
|
|
9:00 AM
|
Day 3
(until 10:00 AM)
(CR13 - R68)
|
9:00 AM
|
Data Unpacking - DATE
-
Jean-Sebastien Graulich
(University of Geneva)
(CR13 - R68)
|
9:20 AM
|
Data Unpacking Software - G4MICE Design
- Dr
Malcolm Ellis
(Fermilab)
(CR13 - R68)
|
9:40 AM
|
Plan for the DAQ System Review
- Prof.
Alan Bross
(Fermilab)
(CR13 - R68)
|
10:20 AM
|
DAQ System Training
(until 12:30 PM)
(R12 (East))
|
10:20 AM
|
Minimal System Configuration
(R12 (East))
|
10:40 AM
|
Minimal Trigger System
(R12 (East))
|
11:00 AM
|
Getting Data
(R12 (East))
|
11:20 AM
|
Unpacking Data
(R12 (East))
|
11:40 AM
|
Developing Readout Code
(R12 (East))
|
12:00 PM
|
Developping Unpacking Code
(R12 (East))
|
|