Description
Title: Offline Calibration Readiness Description: Offline Calibration Readiness - F.Carminati Community: ALICE Meeting Access Information: - Meeting URL http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eiese9vuv9aeanIiatIi - Phone Bridge ID: 12 9914 ---------------1- Central European Summer Time (+0200) Start 2012-03-29 08:30 End 2012-03-29 11:00 UNTIL ---------------39- Central European Time (+0100) Start 2012-12-20 08:30 End 2012-12-20 11:00
***********************************************************
Minutes of the meeting on 06 December 2012
***********************************************************

Present: Marian, Chiara, Ruben, Raffaele, Costin, Gustavo; Davide, Raphaelle, Massimo joint in the second part of the meeting


1) LHC12i processing going on smoothly
    1a) run 193301 has only 10% of the statistics processed, since there were no kCalibBarrel triggers and the downscaling to 10% was applied
        1a1) this hold be only a back-up solution, to be use manually if needed
        1a2) Costin will remove it from production
    1b) run 193047 was not processed since for some reason the MonALISA Shutle page did not update the status of the TRD pp, which was in DONE
        1b1) Costin will implement in his selection a cross-check between the info in the logbook and MonALISA for the preprocessors' statuses
        1b2) the run will be submitted manually by Costin
    1c) Recent runs with small statistics
        1c1) detector experts should be careful when evaluating a period, since in case of negative returning codes (typical example is low statistics) they are not notified and CPass1 starts (since we use the validation codes now)

2) LHC12h
    2a) Marian noticed 3 runs missing from his scripts:
        2a1) 189699 --> failed in the snapshot (already reported at the beginning of November)
            2a1a) Marian will add the check of the snapshot to his scripts
        2a2) 192497, 511 --> to be understood
        2a3) The runs won't be submitted (if it is found that it was needed), since LHC12h has already enough statistics

3) Merge-by-component
    3a) Costin will resubmit the test with the modified executable
    3b) Chiara will commit the changes in the executables to the trunk, as soon as she can commit (problems with svn)
    3c) exit code: for the time being Costin will add that as soon as any aliroot process fails (even one partial merging), the whole process will be interrupted; the result should be equivalent to the current behavior

4) New TPC modules
    4a) To be enabled, a change is needed in the AddTaskTPCcalib macro
        4a1) Since Peter would like not to have any new revisions, we'll use it as input file, taking it from the trunk
            4a1a) Marian will check with Mikolaj that it is ok

5) HMPID still out of CPass reconstruction
    5a) this affects both CPass0 and CPass1
    5b) Marian will add a comment to savannah asking Giacomo what the status is, since it would be important to enable the redo in CPass1 to have HMPID in the QA

6) TPC/Calib/Correction file used as input file in some CPass processed
    6a) it will be simply taken as the other OCDB files from the snapshot; if problems come, we'll go back to the current solution (no specific tests could be done so far)
    
7) pA triggers
    7a) in pA, no SPI will be used, so we have to find out the minimum number of events to have calibration for a run which lasted ~15 minutes (which is the criteria used now, to determine the SPI rate in pp), taking into account that:
        7a1) The minimum number of SPI events that the TRD seems to need to have enough statistics is ~20000
        7a2) The multiplicity in pA should be a factor 4 higher that in pp; we should anyway use factor 3, to be on the safe side
    7b) in "min-bias" like mode (when all will be MB trigger) we'll downscale at redo level as we did for the three runs in LHC12c that did not have kCalibBarrel, and as was done last year; again, it is needed the minimum number of events

8) Wiping of CPass output
    8a) proposal to remove all the chunk-level files, and keep only the merged one; the wiping procedure should occur after the PPass of the period under consideration
    8b) Detectors are asked to prepare a statement for next week

9) LHC12h: calibration readiness for VPass
    9a) Mean Vertex ready
    9b) while checking the Mean Vertex it was found that the MeanVertexSPD object produced online is not ok for some runs
        9b1) under investigation, also in terms of consequences for VPass
    9c) TRD: waiting for QA feedback on 192707-708
    9d) should be ready by the end of the week
    9e) MUON alignment update will be postponed after VPass if everyone else is ready, to save time
    9f) Some runs were with very little statistics (between 192585 and 192676): suggestion to mark them as bad
    9g) Missing detectors contacted at the end of the meeting by Chiara

There are minutes attached to this event. Show them.
    • 09:00 09:20
      Review of Calibration tasks 20m
      Speaker: Latchezar Betev (CERN)
    • 09:20 09:40
      Calibration Discussion 20m
      Speaker: Chiara Zampolli (Universita e INFN (IT))
      Slides