Thermosiphon meeting

→ Europe/Zurich
629-R-013 (CERN)

629-R-013

CERN

Michele Battistin (CERN)
    • 10:00 → 10:10
      Action List 10m
      Cabling: Florian will do a tour with INEO to identify the missing connection. Florian. Pneumatics: Everything is connected on the roof, but degassing and Swagelock valve which is not installed yet. Balcony: pipes close to items, ready to be connected. all the pneumatics connection are missing: Cyril is taking over Mapping of the pneumatic valves to be finished Mapping of the pneumatic actuators Re-do the piping distribution on the valve side. Pierre + Florian A TT is missing on the C6F14 circuit close to the condenser: Cyril has dismounted one of the two connections and Sylvain will install a "doit de gant" there. By-pass of the C6F14 to clean the line before connection the condenser. It shall be designed (Pierre?) and realised (Sylvain?). Do it on the DN25. H2O circuit lagging. Tchuflan has finished. One additional meter in the technical gallery shall be installed. It will be done tomorrow (30/8). Finish the insulation on the roof Ouvaroff has worked yesterday… Put the leak check from scanned on EDMS (Pierre). Install actuator DN200 over the balcony unit (50 kg). We need to install a hook on the roof. Transport is studying the problem. We need to install a scaffolding. Olivier is in contact with Ouvaroff. Modify the actuator of the valve PCV2102B from NC to NO (Cyril). DONE!! Check connections on the H2O skid. All mechanical part has been installed. EL connection to be checked. Etiquettes: Pierre is filling the Infor database on excel format Once done we can produce the etiquette. Olivier will buy the etiquette printer. The chiller equipment shall be entered too Etiquettes for external installation to be done. Hard etiquettes shall be produced. Fix the pipe passages on the walls on different locations: Michele will send mail to Eliseo. Modify and re-install the stairs to go around the cryogenic pipe close to the C6F14 pumping station. Cyril has ordered the material. Protection over the hole for the passage of the pipes from the chiller zone to the technical gallery, Cyril + Juri and Michail. Cyril has ordered the material. Power on all the cupboards Wieslaw said whenever we want. Anders shall pass by on the cupboards. We have to do it officially with Bruno S. Suplice. SH1 Dismounting of the scaffolding: this week. PV1103: liquid by-pass: waiting for the valve, two DN20 PN40 flanges to be ordered. Pierre. Then Sylvain to weld. Valves arrive the 9th of September. Check the procedure to fill-empty the C6F14 line to connect it to the condenser after cleaning. Install the dryers and try the filling pump (Pierre + Cyril). Install a red telephone on the roof. Ask Eliseo concerning the roof on the condenser (Michele). Protect the cable tray on the roof (Cyril + Juri and Michail) I/O List check between Florian and Lukasz. Control: wait for the answer from J&E Hall.
    • 10:10 → 10:50
      Actions List Review 40m
      Speaker: Michele Battistin (CERN)
    • 10:50 → 11:00
      Any Other Business 10m
      Speakers: Claudio Bortolin (Universita e INFN (IT)), Cyril Degeorge (Indiana University (US)), Daniel Lefils (CERN), Florian Corbaz (CERN), Gregory Hallewell (Centre National de la Recherche Scientifique (FR)), Jan Godlewski (CERN), Lukasz Zwalinski (CERN), Olivier Crespo-Lopez (CERN)