    • 10:00 → 10:10
      Action List 10m
      Cabling: visit this morning with Florian Water circuit: no GS on valve GS1531 and the GS on the HV1530. Condenser: one TT on the bottom of the condenser + the TT of Sylvain on the C6F14. Swagelock by-pass valve on the liquid line PV1103 is missing (to be cabled) Sonar part: PV1221 missing, PV1222 missing, PT1202 missing, ST1201 + ST1202 are missing, vacuum pump is missing. Brine: FT1350 to be cabled. By-pass: actuator of valve PV2201 switch to be cabled. On all the external cabling all the "penduilles" shall be black and the white ones shall be taken out (the sun will destroy them) (Cyril = Juri and Michail) Pneumatics: Everything is connected on the roof, but degassing and Swagelock valve which is not installed yet. Balcony: pipes close to items, ready to be connected. all the pneumatics connection are missing: Cyril is taking over Mapping of the pneumatic valves to be finished - DONE Mapping of the pneumatic actuators – DONE Final mapping will be done after pipe connection on the cupboard side. Re-do the piping distribution on the valve side. Pierre + Florian Re-install the flange with the new TT on the C6F14 circuit close to the condenser (Cyril) By-pass of the C6F14 to clean the line before connection the condenser. Waiting for the filter. running Finish the insulation on the roof. All done a part last Swagelock valve + final insulation after C6F16 connection. Put the leak check document from scanned on EDMS (Pierre). Install actuator DN200 over the balcony unit (50 kg). We need to install a hook on the roof. Transport is studying the problem. We need to install a scaffolding. Olivier is in contact with Ouvaroff. Etiquettes: Pierre is filling the Infor database on excel format Once done we can produce the etiquette. Olivier has bought the etiquette printer. The chiller equipment shall be entered too Etiquettes for external installation to be done. Hard etiquettes shall be produced (Claudio). Fix the pipe passages on the walls on different locations: Michele will send mail to Eliseo. Modify and re-install the stairs to go around the cryogenic pipes close to the C6F14 pumping station. Stairs ready but bot installed (Cyril). Ask Alemanno the material needed to finish. Protection over the hole for the passage of the pipes: ready. It will be installed today. SH1 Dismounting of the scaffolding: not done yet: week of 16/9? PV1103: liquid by-pass: waiting for the valve, two DN20 PN40 flanges to be ordered. Pierre. Then Sylvain to weld. Valves arrive the 9th of September. Still waiting on 12/9. Check the procedure to fill-empty the C6F14 line to connect it to the condenser after cleaning. Install the dryers and try the filling pump (Pierre + Cyril). Install a red telephone on the roof and move the red telephone form the balcony (Olivier). Ask Eliseo concerning the roof on the condenser (Michele): before snowing… Protect the cable tray on the roof (Cyril + Juri and Michail). Running. I/O List check between Florian and Lukasz. Control: answer from J&E Hall received: Michele and Lukasz to call them today or tomorrow. H2O: PV1501 on-off instead that PCV. The pump is not fixed. We mis two switches. Electrical cupboard HSE visit certification: Florian is preparing the dossier. Close to be finished. Power on all the cupboards Wieslaw said whenever we want. Waiting for HSE certification. Problem on the torc on the PV4301: Pierre has added two springs. To be tested otherwise we have to replace the actuator. Documentation: Ceclia to suggest a folder structure for EDMS
    • 10:10 → 10:50
      Actions List Review 40m
      Speaker: Michele Battistin (CERN)
    • 10:50 → 11:00
      Any Other Business 10m
      Speakers: Claudio Bortolin (Universita e INFN (IT)), Cyril Degeorge (Indiana University (US)), Daniel Lefils (CERN), Florian Corbaz (CERN), Gregory Hallewell (Centre National de la Recherche Scientifique (FR)), Jan Godlewski (CERN), Lukasz Zwalinski (CERN), Olivier Crespo-Lopez (CERN)