13–16 May 2014
Elettra - Sincrotrone Trieste
Europe/Zurich timezone

Session

Tuesday morning 2

13 May 2014, 11:00
Hotel NH Trieste (Elettra - Sincrotrone Trieste)

Hotel NH Trieste

Elettra - Sincrotrone Trieste

Hotel NH Trieste Corso Cavour 7 34132 Trieste Italy

Conveners

Tuesday morning 2

  • Alireza Nassiri (Argonne National Laboratory)

Presentation materials

There are no materials yet.

  1. Mark Wissmann (J)
    13/05/2014, 11:00
    SPC judgements
    Oral presentation
    CEBAF (Continuous Electron Beam Accelerator Facility) at Jefferson Lab was initially designed to deliver up to a 4 GeV electron beam simultaneously to three experimental halls. The maximum deliverable energy was raised to 6 GeV and CEBAF ran there until May of 2012 after which CEBAF entered an extensive, upgrade shutdown. After the upgrade, scientists plan to use CEBAF to deliver 11 GeV beam...
    Go to contribution page
  2. Hartmut Büttig (Helmholtz Zentrum Dresden-Rossendorf)
    13/05/2014, 11:30
    SPC judgements
    Oral presentation
    H. Büttig, A. Arnold, A. Büchner, M. Justus, M. Kuntzsch, U. Lehnert, P. Michel, R.Schurig, G. Staats, J.Teichert. Radiation Source ELBE, Helmholtz Zentrum Dresden- Rossendorf, Germany Abstract: In January 2012 the 10 kW klystrons of the CW LINAC ELBE were replaced by pairs of 10kW solid state power amplifiers (SSPA). The talk gives an overview on the SSPA based ELBE RF system....
    Go to contribution page
  3. Mr James Rose (Brookhaven)
    13/05/2014, 12:00
    SPC judgements
    Oral presentation
    The NSLS-II has completed early commissioning with the booster synchrotron utilizing a 80 kW IOT transmitter powering a 7-cell “PETRA” like cavity and the storage ring a 300 kW klystron transmitter powering an identical cavity. The 7-cell cavity in the storage ring will be replaced with a “CESR-B” like superconducting cavity during the May 2014 shutdown. Both the klystron and IOT transmitters...
    Go to contribution page
Building timetable...