15–17 Dec 2014
CERN
Europe/Zurich timezone

Status of the HIE-ISOLDE Project

16 Dec 2014, 16:35
25m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map

Speaker

Yacine Kadi (CERN)

Description

After 20 years of successful ISOLDE operation at the PS-Booster, a major upgrade of the facility, the HIE-ISOLDE (High Intensity and Energy ISOLDE) project was launched in 2010. It is divided into three parts; a staged upgrade of the REX post-accelerator to increase the beam energy from 3.3 MeV/u to 10 MeV/u using a super-conducting Linac, an evaluation of the critical issues associated with an increase in proton-beam intensity and energy (increase from 1.4 GeV to 2 GeV) and a machine design for an improvement in RIB quality. The latter two will be addressed within the HIE-ISOLDE Design Study. This presentation aims to provide an overview of the present status of the overall project by providing; an insight to the infrastructure modifications, progress on the high beta Quarter Wave Resonant (QWR) cavities and cryomodule production as well as the installation of the HEBT lines.

Author

Co-authors

Presentation materials