28 June 2015 to 2 July 2015
JW Marriott Starr Pass Resort
Etc/GMT-7 timezone

Session

C2OrB - Large Capacity Coolers

C2OrB
30 Jun 2015, 11:00
JW Marriott Starr Pass Resort

JW Marriott Starr Pass Resort

Tucson, Arizona USA

Conveners

C2OrB - Large Capacity Coolers

  • Julien Tanchon (Absolut System SAS)
  • Yatming Than (BNL)

Presentation materials

There are no materials yet.

  1. Mr Nick Emery (Callaghan Innovation)
    30/06/2015, 11:00
    CEC-03 - Cryocoolers (Non-Aerospace)
    Contributed Oral Presentation
    Fabrum Solutions in association with Callaghan Innovation and Absolut System has developed a 330 W pulse tube cryocooler based on Callaghan Innovation’s diaphragm pressure wave generators (DPWG). A cost-effective, long life and robust cryocooler has been achieved due to the pulse tube’s lack of moving parts and the DPWG’s metal diaphragms separating the working gas from the oil lubricated...
    Go to contribution page
  2. Alan Caughley (Callaghan Innovation)
    30/06/2015, 11:15
    CEC-03 - Cryocoolers (Non-Aerospace)
    Contributed Oral Presentation
    Fabrum Solutions in collaboration with Callaghan Innovation has been developing large pulse tube cryocoolers based on Callaghan Innovation’s diaphragm pressure wave generators (DPWG). The pulse tube’s lack of moving parts in combination with the DPWG’s metal diaphragms produces a cost-effective, long life and robust cryocooler. The DPWG has had 10 years of development, resulting in a series of...
    Go to contribution page
  3. Dr Philip Spoor (Chart Industries)
    30/06/2015, 11:30
    CEC-03 - Cryocoolers (Non-Aerospace)
    Contributed Oral Presentation
    Several years ago, we reported on a 50-gallon-per-day oxygen liquefier that uses Stirling-type pulse-tube coldheads driven by a large flexure-bearing pressure wave generator (PWG), in development for the new generation of U.S. Navy aircraft carriers. The first of these liquefiers is about to be deployed on the USS Gerald R. Ford. This presentation describes the completion and performance...
    Go to contribution page
Building timetable...