22–29 Jul 2015
Europe/Vienna timezone

Improvements to ATLAS track reconstruction for Run-2

Not scheduled
20m
poster Detector R&D and Data Handling

Speaker

Hideyuki Oide (CERN)

Description

Run-2 of the LHC will provide new challenges to track and vertex reconstruction with higher energies, denser jets and higher rates. In addition, the Insertable B-layer (IBL) is a fourth pixel layer, which has been inserted at the centre of ATLAS during the shutdown of the LHC. We will discuss improvements to track reconstruction developed during the two year shutdown of the LHC. These include novel techniques developed to improve the performance in the dense cores of jets, optimisation for the expected conditions, and a big software campaign which lead to a factor of three decrease in the CPU time needed to process each recorded event. The commissioning of the detector in preparation for Run-2 using cosmic data and, if available, collision data will also be discussed.

additional information

Submitted on behalf of the ATLAS Inner Tracking Combined Performance Group by the ATLAS Speakers Committee representative Alex Read (a.l.read@fys.uio.no). Alex is not the speaker! A speaker will be selected by the Speakers Committee when the abstract is accepted.

Author

Presentation materials

There are no materials yet.