Beam Physics Meeting

→ Europe/Zurich
1/1-025 (CERN)

1/1-025

CERN

20
Show room on map
DS: Mandate of Beam Physics group were presented. DS / GR: The issue of decelerator sector length was clarified; it has been decided earlier by the Design Comitee that the decelerator sector lengths will differ, in order to have the same final max. energy spread for all decelerator detectors (optimizes for extraction efficiency). HS: The terms "resolution", "accuracy", "precision" and "stability" were clarified/ The first two instrument specification drafts were discussed, damping ring (YP) and injector complex(LR). EA, 2-jul-2008
There are minutes attached to this event. Show them.
    • 16:00 → 16:10
      Mandate 10m
      Slides
    • 16:10 → 16:20
      Decelerator length 10m
      Speaker: Daniel Schulte (CERN)
      Slides
    • 16:20 → 16:30
      Instrumentation Definitions 10m
      Speaker: Hermann Schmickler (AB-BDI)
      document
    • 16:30 → 16:40
      Damping Ring 10m
      Speaker: Yannis Papaphilippou (CERN)
      Slides
    • 16:40 → 16:50
      BDS 10m
      Speaker: Rogelio Tomas (CERN)
      Slides
    • 16:50 → 17:00
      Injector Complex 10m
      Speaker: Louis RINOLFI (CERN)
      Slides
    • 17:00 → 17:10
      Post Collision Line 10m
      Speaker: Konrad Elsener (CERN)
      document
      Slides
    • 17:10 → 17:20
      Main Linac 10m
      Slides
    • 17:20 → 17:30
      Drive Beam I 10m
      Speaker: Bernard Jeanneret (CERN)
    • 17:30 → 17:40
      Drive Beam Decelerator 10m
      Speaker: Erik Adli (European Organization for Nuclear Research (CERN))
      Slides