11–12 Dec 2008
CERN
Europe/Zurich timezone

Discussion on addressed topics and on integration issues between WG1, 2 and 3

12 Dec 2008, 12:00
30m
AT Auditorium (CERN)

AT Auditorium

CERN

Description

Power coupler: - Define the conceptual design, the layout of cooling (including thermal loads) and diagnostical tools, choice of materials (waveguide, window) - Perform multipactor studies, assess methods of multipactor suppression and elaborate coating techniques - Acquire data on the secondary emission coefficient (SEC) of materials involved - Identify manufacture and conditioning facilities - Identify required equipment for coating and conditioning Frequency tuner - Perform by computer simulation Lorentz-force detuning studies of cavity design and confirm by measurement - Develop and test slow tuner; integrate the design into that of the cryomodule - Develop and test fast tuner; integrate the design into that of the cryomodule - Develop scenarios for failing cavities (detuning) Magnetic shielding - Design by computer simulation or analytically the magnetic shielding; manufacture it Identify potential contributers and deadlines

Presentation materials

There are no materials yet.