32nd WP8 Bi-weekly meeting (2016-02) [TAXN, LS2 activities]

Europe/Zurich
530/R-030 - BE-EA Conference Room (CERN)

530/R-030 - BE-EA Conference Room

CERN

35
Show room on map
Description
TAXN. Discussion about LS2 activities for IR8: Mini-TAN, Mask for D2..

Attendance: C. Adorisio (DGS-RP), J. Albertone (BE/BI), C. Boccard (BE/BI), D. Brethouzx ((EN/EA), M. CZech (EN/HE), S. Evrard (EN/EA), P. Fessia (TE/MSC), J. Jakobsen (BE-BI), F. Sanchez Galan (EN/EA), A. Tsinganis (EN/STI)

- TAXN Pt8:  60 cm location discrepancy to be checked with Samy/Survey.

- TAXN in general: conflict between stretched wire and mini-cranes to be analyzed. Enrico pointed out that a proposal for a robust protection at the level of the BRAN should be made.

- mini-crane for TAXN Pt8?  In line with TAN at P1 and P5, BRAN will need to be remotely operated. Depending on the operation scenarios, RP needs to be defined. This have an impact in Budget &integration.

- Enrico pointed out that  BRAN/TAXN geometry should be improved in order to ease remote handling (no sharp edges, guiding tools,…). This is applicable for all TAXN's

- radiation hard camera would be useful to get full remote control capacity

- TAXN cooling/bakeout/BRAN in place --> thermal studies needed

- signal cables --> plug-in system or quick connector.

 

Notes by S. Evrard

There are minutes attached to this event. Show them.