- Compact style
- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
Attendance: C. Adorisio (DGS-RP), J. Albertone (BE/BI), C. Boccard (BE/BI), D. Brethouzx ((EN/EA), M. CZech (EN/HE), S. Evrard (EN/EA), P. Fessia (TE/MSC), J. Jakobsen (BE-BI), F. Sanchez Galan (EN/EA), A. Tsinganis (EN/STI)
- TAXN Pt8: 60 cm location discrepancy to be checked with Samy/Survey.
- TAXN in general: conflict between stretched wire and mini-cranes to be analyzed. Enrico pointed out that a proposal for a robust protection at the level of the BRAN should be made.
- mini-crane for TAXN Pt8? In line with TAN at P1 and P5, BRAN will need to be remotely operated. Depending on the operation scenarios, RP needs to be defined. This have an impact in Budget &integration.
- Enrico pointed out that BRAN/TAXN geometry should be improved in order to ease remote handling (no sharp edges, guiding tools,…). This is applicable for all TAXN's
- radiation hard camera would be useful to get full remote control capacity
- TAXN cooling/bakeout/BRAN in place --> thermal studies needed
- signal cables --> plug-in system or quick connector.
Notes by S. Evrard