CRU Weekly meeting (21 Sept 2016)
Present: Erno, Jubin, mazsi, Sanjoy, Shuaib
Secretary: Erno(8), PiPPo(7), Shuaib(1), mazsi(4)
Actions:
- EDR report from Alex: questions were assigned to people, everyone should start preparing the answer to the questions assigned to him/her.
- date of EDR follow up: will be aligned with prototype FW release
- shuaib will report back when we can start accessing remotely the Arria10 card they have received in kolkata.
- jubin will send around presentation on XCVR clocking.
Report on Actions:
1. 10G PON
- small modifications, no significant update.
- update from altera on 2UI error: "this seems like a bug we are currently investigating".
2. GBT
- Added muliple bank support - not the same we had earlier (now supports up to 15 link per module);
- uses 1 ATX PLL / module; xN clock lines.
- probably still not the final clocking scheme.
- question to answer: do we gain [skew] performance if we incorporate bonding?
- Working on enabling the multiple GBT links and PLLs.
3. DCS
4. PCIe
- opened the door to the GBT to push data using FIFO like interface.
- still working on some bugs [1 word data corruption on transfer boundary].
- will push changes to git
5. Integration
- lots of work by erno on simulation.
- mazsi added in simulation TTCPON to erno's GBT simulation. PCIe still in separate simulation.
AOB
Vacations
- PiPPo at CERN in september, on conference 10-14 october, on leave until 7 november (but can work remotely).
There are minutes attached to this event.
Show them.