Conveners
SESSION 6: SYSTEMS: SESSION 6: SYSTEMS
- Reyes Alemany Fernandez
- Wolfgang Bartmann
-
Chiara Bracco14/12/2016, 13:30
LHC operation in 2016 was limited by the constraints on the maximum allowed intensity in the SPS due to the vacuum leak at the internal dump. The present baseline foresees the replacement of the TIDVG with a new upgraded hardware during the upcoming EYETS. This would allow providing nominal 25 ns to the LHC as well as beams with a brightness well beyond design. Nevertheless, the consequences...
Go to contribution page -
Mike Barnes14/12/2016, 13:50
Substantial upgrades were carried out to the MKI beam screen during LS1: as a result MKI heating has not limited LHC operation since LS1, and is not expected to do so during Run 2. Similarly, during LS1, the vacuum systems on the interconnects between MKI magnets were upgraded: as a result there haven’t been any issues with SIS vacuum thresholds on the interconnects between adjacent MKIs....
Go to contribution page -
Daniel Valuch14/12/2016, 14:10
-
Georges Trad14/12/2016, 14:30
-
Helga Timko14/12/2016, 14:50
-
Salvatore Danzeca14/12/2016, 15:10