Plan for 2017: Summary of requests received 35m
Short description to motivate the request for R&D activity needed by the end of current week (November 4th)
Present: CMS-CSC (Katerina), CMS-DT (Ignacio), ATL-MM_prototype (Barbara), ATL-MM_mod0 (Yan), EP-DT (Roberto), CMS-GEM (Ilaria), ATL-TGC (Henso), CMS-RPC (Nicolas)
CMS-CSC (Katerina) opt3rd
CMS-DT (Ignacio) no preference
ATL-MM_prototype (Barbara) opt3rd
ATL-MM_mod0 (Yan) opt4th
EP-DT (Roberto) no preference
CMS-GEM (Ilaria) no preference
ATL-TGC (Henso) opt4th
CMS-RPC (Nicolas) opt4th
Option 4th will be submitted to SPS coordinator
-
09:45
→
10:15
Report about the “half-filter” test 30m
postponed wed Nov10
Speakers: Domenico Dattola (Universita e INFN Torino (IT)), Ignacio Redondo Fernandez (Centro de Investigaciones Energéti cas Medioambientales y Tecno)Update October 20:
Installation went smooth
Safety visit ok
Characterization/data taking on-going
Proposal-1
Install October 19
Test October 20-21
Move out October 21
Proposal-2
Enter on October 19
Install October 24
Test October 24-25
Move out October 26
ATL-TGC (Isabel) not aware of any reason to stop. No preferred proposal.
CMS-CSC (Katerina) not aware of any reason to stop. No preferred proposal (tbc by tomorrow).
CMS-DT (Ignacio) supporting the test. small preference for Proposal-1.
CMS-GEM (Ilaria) not in the bunker
ATL-MDT (Bini) not in the bunker
CMS-RPC (Ian) not aware of any reason to stop. No preferred proposal.
ATL-MM (Barbara) not in the bunker
EP-DT (Antonio) not aware of any reason to stop. No preferred proposal.
ATL-RPC (Giulio) not present
Conclusion:
Test will be performed next GIF week-time (wed Oct 19-26).
We wait CSC and RPC to decide between Proposal-1 and Proposal-2
Half-Filter will be removed right after test will be completed (Max 2 days).
Safety inspection for Wed Oct 19.
-
10:15
→
10:30
Iteration of new requests for tests at GIF 15m
introduction, goal of the test, plan, needs
-
ATL-CSC 5mSpeaker: Cenk Yildiz (University of California Irvine (US))
Hi Roberto,
We are planning some more tests with the Atlas CSC chamber in 2017.
We will be repairing two chambers and want to test them before reinstallation in February or March. Each chamber needs only one or two days close to the source. Will there be time available for this test?
Regards,
Michael Schernau
requested position: on the side of the Glass-RPC rack. To be discussed (after April RPC will probably replace the present rack with larger one).
-
-
10:30
→
10:40
Announcement 10m
1) Maintenance of the irradiator: end of March - 3 days. Nobody see problems/conflicts
2) Commissioning of the gas detection: last part of EYETS - 1 week "full" stop of GIF. Proposed to join with maintenance of the irradiator
3) Installation of upstream XTDV table: requested to install first week 2017 (possibly while waiting for gas supply/detection to be restarted)
4) INFN-AIDA film: Friday 18th. Probably GIF off during morning (9am-2pm)