GIF++ installation and schedule meeting
-
- 09:00 → 09:10
-
09:10
→
09:30
Iteration of new requests for tests at GIF 20m
introduction, goal of the test, plan, needs
-
ATL-CSC 5mSpeaker: Cenk Yildiz (University of California Irvine (US))
CSC are installed on the side of CMS-GlassRPC ("U2")
Connected to gas and HV.
In the bunker until March/April 2017
Hi Roberto,
We are planning some more tests with the Atlas CSC chamber in 2017.
We will be repairing two chambers and want to test them before reinstallation in February or March. Each chamber needs only one or two days close to the source. Will there be time available for this test?
Regards,
Michael Schernau
requested position: on the side of the Glass-RPC rack. To be discussed (after April RPC will probably replace the present rack with larger one).
-
Irradiation of optical fiber Belle II - PID 5m
installation scheduled for November 17 or 24
Speaker: Ezio Torassa (Universita e INFN, Padova (IT)) -
GEM1 and GEM2 setups installation 5mSpeaker: Lisa Borgonovi (Universita e INFN, Bologna (IT))
-
-
09:30
→
09:40
Material door: EN proposal 10m
ATL-MM and CMS-RPC express concern about size of detector+support structure given the fact that the beam is already at 1.6 m.
ATL-MM and CMS-RPC should send some drawing of detector+support structure to understand if there is any height conflict with the door.
Drawings received. Martin will re-discuss with EN possible door sizes.
-
09:40
→
09:55
Future Upgrades to the Facility - DT part 15m
A chance to suggest improvements to to area / control system / etc
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)You can subscribe to the calendar with the following link (to be added in you calendar application)http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics
Last weeks request :
- Phone coverage inside bunker. - Investigation ongoing
- Area labels for all areas - DONE
Ongoing Projects :
- Upgrade of GIF Control System - Online View (Web)
- Update of DIP publications : NEW path available, old path to be removed after Winter Closure
- Update of GIF Web Page
New request :
- Hardware Signals for source on/off & filter change.
- Update of Elog to change "Subject" of mails send
- Automatic entry of Irradiator on/off + filter settings (?)
- Heartbeat for DIP publications
-
09:55
→
10:30
Announcements & AOB 35m
1) Maintenance of the irradiator: end of March - 3 days. Nobody see problems/conflicts
2) Commissioning of the gas detection: last part of EYETS - 1 week "full" stop of GIF. Proposed to join with maintenance of the irradiator
3) Installation of upstream XTDV table: requested to install first week 2017 (possibly while waiting for gas supply/detection to be restarted)
4) INFN-AIDA film: Friday 18th. Probably GIF off during morning (9am-2pm)
-
INFN-AIDA film - last Friday. Feedback ? 5m
-
Maintenance of the irradiator: Week 13 2017 (27-30.03) 5m
-
Commissioning of the gas detection: last part of EYETS - 1 week "full" stop of GIF. Proposed to join with maintenance of the irradiator 5m
-
-
10:30
→
10:50
Setups planning for 2017 20m