GIF++ installation and schedule meeting

→ Europe/Zurich
892/1-B09 (CERN)

892/1-B09

CERN

30
Show room on map
Martin Richard Jaekel (CERN), Roberto Guida (CERN)

Attendance : (to be filled)

  • Martin (EP-DT)
  • x
  • x
  • x
  • x

Vidyo :

  • x
  • x
  • x
There are minutes attached to this event. Show them.
    • 09:00 → 09:10
      Plan for next wednesday (MD) / thursday (source scan) 10m

      Thursday :

      Filter Scan :
      --------------------

       

      Downstream

      1 ) EP-DT- 13h30 - 14h30

      14h30-19h

      Heraldo 18h30-24h  (maybe)

      Upstream

      ATLAS-MM 10-13h - 15h30-18h30

       Next Wed Dez 30 : Maybe Katarina ?

       

    • 09:10 → 09:25
      Iteration of new requests for tests at GIF 15m

      introduction, goal of the test, plan, needs

      Proposals discussed.

      Everybody confirmed to not see any problem with both installations as long as they were presented and do not interfere with current R&D test at GIF

      • ATL-CSC 5m
        Speaker: Cenk Yildiz (University of California Irvine (US))

        CSC are installed on the side of CMS-GlassRPC ("U2")

        Connected to gas and HV. 

        In the bunker until March/April 2017

         

         

        Hi Roberto,

        We are planning some more tests with the Atlas CSC chamber in 2017.

        We will be repairing two chambers and want to test them before reinstallation in February or March. Each chamber needs only one or two days close to the source. Will there be time available for this test?
         

        Regards,

        Michael Schernau

         

         

        requested position: on the side of the Glass-RPC rack. To be discussed (after April RPC will probably replace the present rack with larger one).

         

      • AIDA2020-radiocromich film 5m
        Speaker: Francesco Fienga (Universita e INFN, Napoli (IT))

        On-site check next week.

        Installation postponed. Setup not ready.

      • Irradiation of optical fiber Belle II - PID 5m

        installation scheduled for November 17 or 24

        Speaker: Ezio Torassa (Universita e INFN, Padova (IT))

        Irradiation complete, samples already removed yesterday.
        Some questions for the RADMON sensors data and how to interpret them.
        We will investigate what data has been given by DT.



         

      • GEM1 and GEM2 setups installation 5m
        Speaker: Lisa Borgonovi (Universita e INFN, Bologna (IT))

        Preferred installation : Closest Position downstream.

        Looks feasible. Meeting on site (Bunker) next Wednesday to define the space organisation.

         

    • 09:30 → 09:45
      Upgrades to the Facility 15m

      A chance to suggest improvements to to area / control system / etc

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      You can subscribe to the calendar with the following link (to be added in you calendar application)http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      Last weeks request :

      • Phone coverage inside bunker.  - Investigation ongoing
      • Area labels for all areas - DONE

      Ongoing Projects :

      • Upgrade of GIF Control System - Online View (Web)
      • Update of DIP publications : NEW path available, old path to be removed after Winter Closure
      • Update of GIF Web Page

      New request :

      • Hardware Signals for source on/off & filter change.
      • Update of Elog to change "Subject" of mails send
      • Automatic entry of Irradiator on/off + filter settings (?)
      • Heartbeat for DIP publications
    • 09:45 → 10:20
      Announcements & AOB 35m
      • Upcoming Interventions 10m

        Scheduled:
        ---------------

        16.12.2016   Cut of GAS SUPPLY for Christmas break. Restart on January 9 !

        27-29.03.2017 Irradiator Maintenance

        30.03 - DSO Test 

         

        To be scheduled :
        ----------------------

        Commissioning of the gas detection - last part of EYETS - 1 week full stop of GIF.
        Proposed to join with maintenance of the irradiator

        Installation of upstream XTDV table: 1 week of full stop.

      • New Announcements 5m
        Speaker: Martin Richard Jaekel (CERN)

        Change of DIP publication path : please use /dip/GIFpp/ now. 
        The old path /dip/GIFppGPN/ will disapear after Christmas.

      • Any Other Buisness 10m

        GAS BILL : please note that the EP-DT budget for GIF does not cover consumables.
        Gas used at the GIF++ will have to be paid by the consumer. We will start the TIDs now. 

    • 10:20 → 10:40