    • 09:10 → 09:20
      Plan for next Wednesday (MD) / Thursday (source scan) 10m

      ACCESS REQUESTS :

      Today :

      • Access requests : 11h - bunker access (≈1h) for updating bunker CAD  model

      Friday (!) :

      • Access before gas stop - 2-3h, starting in the morning.

      Wednesday NEXT WEEK :

      • Any request ?
      • Bunker opening ? (last chance before 18.01.2017)
      • We maybe open on any day - request before Friday - we open on Monday or Tuesday

      FILTER SCAN :
      --------------------

      Thursday Downstream :

      • ATL-TGC  : 9h-12
      • CMS-CSC : 12h-18h

      Thursday Upstream :
      ------------

      • CMS-RPC : 9h-12h

       

       

       

    • 09:20 → 09:35
      Iteration of new requests for tests at GIF 15m

      introduction, goal of the test, plan, needs

      Proposals discussed.

      Everybody confirmed to not see any problem with both installations as long as they were presented and do not interfere with current R&D test at GIF

      • AWAKE Mirrors 5m

        Irradiation of 2 optical mirrors with coating.

        Speaker: Bartolomej Biskup (CERN)

        Short notice irradiation of optical mirrors for evaluation. Mirrors to be ordered early next year.
        Samples installed, to be removed next week after irradiator stop.

      • GEM1 and GEM2 setups installation 5m
        Speaker: Lisa Borgonovi (Universita e INFN, Bologna (IT))

        Preferred installation : Closest Position downstream.

        Looks feasible. Meeting on site (Bunker) next Wednesday to define the space organisation.

         

    • 09:35 → 09:45
      GIF - RD51 shared beam time 10m

      User Feedback on the proposed common beam time for RD51 and GIF

    • 09:45 → 09:55
      IMPACT for 2017 10m

      Proposal for IMPACT usage in 2017

      Proposal : One IMPACT per setup.

      • two chambers on individual supports -> 2 IMPACTs
      • multiple chambers swapped on same or similar support -> one IMPACT
      • basically, if you need two locations, please make two IMPACT declaration (clone)

      Each Setup should have IMPACT label attached with number. We can provide paper labels.

      Attached documents : CAD file (if available, otherwise dimensions). Picture ?

      New organisation of  space in IMPACT ?

    • 09:55 → 10:05
      Upgrades to the Facility 10m

      A chance to suggest improvements to to area / control system / etc

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      Ongoing Projects :

      • Upgrade of GIF Control System - Initial list submitted to DT controls group
      • Update of Elog to change "Subject" of mails send
      • Automatic entry of Irradiator on/off + filter settings (?)
      • Phone coverage inside bunker.  - Fixed Phone  mounted in main area. To be active soon.

      Web Page :

      • Update of GIF Web Page live - please provided feedback and suggestions.
      • Thanks to Barbara for providing publications ! Please follow this example.

      New request :

      • Check Temperature !

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

    • 10:05 → 10:10
      Christmas Closure 5m

      Gas / Electricity / Cooling / Access

      Gas Usage request :

      • CMS-DT  : 50 l/h Ar/CO2 (40/60%)  - NOT POSSIBLE
        (Alternative : 10 l/h)
      • PH-DT : some gas
      • CMS-CSC  : 6-9 l/h Ar/CO2 (40/60%)

      Cooling : Intervention on raw water supply.

      19.12.2016 17h  until March 17, 2017 (!)  the entire cooling of the building 887 will be stopped.

    • 10:15 → 10:20
      Announcements & AOB 5m
      • Upcoming Interventions 10m

        Scheduled:
        ---------------

        16.12.2016   Cut of GAS SUPPLY for Christmas break  15h (!)
                             Restart on January 9 !

        19.12.2016 17h  until March 17, 2017 (!)  the entire cooling of the building 887 will be stopped.

        21.12.2016   12h- End of irradiation - closure of GIF bunker area

        05.01-18.01 (+7d) - EHN1 crane unavailable. No opening of bunker area.

        09.01 6.am-6h30 CERN Wide Power Cut

        27-29.03.2017 Irradiator Maintenance

        30.03 - DSO Test 


         

        To be scheduled :
        ----------------------

        Commissioning of the gas detection - last part of EYETS - 1 week full stop of GIF.
        Proposed to join with maintenance of the irradiator

        Installation of upstream XTDV table: 1 week of full stop - waiting for feedback (our proposal was to start 1 week before DSO test)

        Open Discussions : bunker door (waiting for EN feedback)

        Painting of lead bricks - removal and reinstall of all lead bricks (March-April ?)

      • New Announcements 5m
        Speaker: Martin Richard Jaekel (CERN)
      • Any Other Buisness 10m

        GAS BILL : please note that the EP-DT budget for GIF does not cover consumables.
        Gas used at the GIF++ will have to be paid by the consumer. We will start the TIDs now. 

        FOR NEXT YEAR : Operational budget for the GIF has been reduced by ≈ 20%

         

         

        DT - use the rack on second floor

    • 10:25 → 10:45
      Setups planning for 2017 20m