Space reservation request for LSS5 of the SPS, for positions 51610 through 52010. This SRR is part of the LHC Injectors Upgrade (LIU) framework, which covers SPS, and seeks to prepare the reliable delivery of the required beams to the LHC, to meet the goals of the High Luminosity LHC (HL-LHC) project.
Part of the LIU-SPS project concerns the upgrade of the SPS Beam Dump system, which is planned to be relocated from LSS1 to LSS5 with upgraded kicker system and dump block which will allow extraction of the full range of beam energies onto a single dump block.
With respect to the previous approved version 1.0, this SRR reserves also space for the relocation of the BSRT instrument actually located in half period 520 to half period 516 and for an upgraded version of the rotational wire scanner in half period 519.
Reservation of space for fire doors in half periods 517 and 520 and the relocation of BCTDC and BCTFS in half period 519 after installation of BCTW during EYETS 2016-2017 are also described.