LIU - Planning & Installation meeting

→ Europe/Zurich
864/1-B04 (CERN)

864/1-B04

CERN

22
Show room on map
    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-IONS ECR LEI-BPM-EC-0002 (EDMS 1829177) Installation of Beam Position Monitors in the LEIR ETL line 15m

      This ECR details the installation of 5 beam position monitors in the ETL injection line to LEIR.

      Speaker: Lars Soby (CERN)
    • 16:25 → 16:40
      LIU-IONS ECR LEI-TD-EC-0001 (EDMS 1574176) Installation of an External Dump in the LEIR ETL Transfer Line 15m

      This document describes the modifications in the LEIR-PS transfer line machine in order to install a new external dump. These modifications include the replacement of the vacuum chamber inside the magnet ETL.BHN10 and the installation of the LEIR Dump directly linked to the end of this vacuum chamber. The changes are foreseen to be installed in the YETS 2017-2018.

      This ECR is part of the LHC Injectors upgrade (LIU) framework, which concerns the LEIR machine, to meet the goals of the LIU Ions luminosity in LHC.

      Speakers: Antonio Perillo Marcone (CERN), Chiara Di Paolo (CERN)
    • 16:40 → 16:55
      LIU-PS ECR PS-MDBCC-EC-0002 (EDMS 1822572) Correction of Orbit Distortion 'BGI Magnet' PR.MDB82 in the PS Ring 15m

      The operation of the BGI magnet is needing a correction of the integrated dipolar field due to the effect of coupling with the adjacent main magnets. This document details the chosen solution which consists of installing a second power supply. This will allow to power the main coils used around the detector and the trim coils used for the return field separately. Tuning of the integrated field will be performed by setting different currents between the two circuits.

      Additional data can be found on the Indico Page: 645350.

      Speakers: Dominique Bodart (CERN), Yves Thurel (CERN)
    • 16:55 → 17:10
      LIU-PS ECR PS-BWSRB-EC-0001 (EDMS 1821271) New Rotatable Beam Wire Scanner Prototype Installation in the PS Ring 15m

      It is proposed to install one prototype rotatable beam wire scanner. The device is used to measure and reconstruct the beam profile. Following tests in the PS a series of instruments will be installed in PS, SPS and other sections of PSB during the LS2 as part of the LIU project.

      Speakers: Dmitry Gudkov (CERN), Raymond Veness (CERN), William Andreazza (CERN)
    • 17:10 → 17:15
      AoB 5m