Choose timezone
Your profile timezone:
This document concerns the disassembly of the Linac2 transfer line from the end of the DTL cavities, DTL cavities not included, up to the LT.BHZ20 magnet. The aim is to liberate space for new items installation (bldg.363/R-402), described in the ECR: CPS-LJ-EC-0002 "Connection of the Linac4 to the LT.BHZ20"
This document concerns the Linac4 connection with the PSB injection transfer line, LT,
through the LT.BHZ20 magnet. Prior to the start of the activities detailed here the partial
disassembly of Linac2 described in the ECR: CPS-LJ-EC-0003 shall be carried out to
liberate the working space for new items, bldg.363/R-402.